Skip to main content
LIVEResearch desk operatingU-37425Entergy LA filing · 7.2 GW load additionRICHLANDHyperion phase 3 permit acceptedCADDOSTACK substation civil mobilisingW. FELICIANAHut 8 River Bend hearing 06/03
Infrastructure tracker

Louisiana AI data center tracker.

Start here: the tracked buildout in one paragraph.

LouisianAI tracks the live Louisiana AI data-center buildout by operator, parish, status, capex, peak MW, water exposure, LPSC docket posture, and source-linked project page. Use the rows below to move from statewide scale to the exact filing, operator, or permit trail behind each campus.

6 projects · $80.9B aggregate capex · 9,610 MW peak (mid-est.) · edition 2026.07.23
TableMapTimelineJSON
Capex tracked
$80.9B
Peak MW (sum)
9,610
Active builds
4 / 6
LPSC dockets
2 open / 4
Operators
6
Parishes
5
Filter
Filter data center tracker rows
Sort and density controls
Export CSV
Default tracker lens

What is the Louisiana AI infrastructure tracker?

The Louisiana AI infrastructure tracker is LouisianAI's source-cited register of every tracked AI and hyperscale data center project in the state: operator, parish, status, capex, peak MW, timeline posture, confidence level, and links to project-level evidence.

What is the Louisiana data center timeline?

The Louisiana data center timeline starts with Meta Hyperion under construction in Richland Parish, Amazon and STACK's multi-campus northwest Louisiana buildout after the March 2026 Bossier final plat, Hut 8 River Bend's 245 MW Phase I lease plus parish water-system work, and Applied Digital Delta Forge 1 after its January 2026 groundbreaking and mid-2027 operations target.

What is Louisiana data center power demand?

Louisiana data center power demand is already multi-gigawatt: quantified tracker rows sum to roughly 9.6 GW, and the broader announced and planned AI pipeline exceeds 8 GW when later-stage load is included. The LPSC docket trail decides which generation and transmission projects can energize that load.

What is Louisiana data center capex announced?

Louisiana data center capex announced depends on the layer being cited. The row-level tracker on this page shows roughly $80.9B of source-linked project capex, while the statewide overview carries the broader $60B-plus announced pipeline answer when later expansion framing is included. Each row links to the project profile behind the capex number.

What data infrastructure exists in New Orleans, LA?

New Orleans data infrastructure in this tracker is operational colocation: EdgeConnex New Orleans and Fogo New Orleans in Orleans Parish. The hyperscale AI campuses driving most new Louisiana power demand are outside New Orleans.

What is Meta Hyperion data center status in 2026?

Meta Hyperion is under construction in Richland Parish in 2026. It is the largest tracked Louisiana AI data center, with a confirmed 5 GW build-out costing more than $50 billion, announced by Meta on July 13, 2026.

Which operators are building Louisiana AI data centers?

The Louisiana operator set is Meta in Richland Parish, Amazon Web Services with STACK in Caddo and Bossier Parishes, Hut 8 at River Bend in West Feliciana Parish, Applied Digital at Delta Forge 1 in Rapides Parish, plus operational colocation operators in Baton Rouge and New Orleans.

What is Louisiana data center water and environmental impact?

Louisiana data center water and environmental impact is project-specific: cooling design, permitted withdrawals, discharge path, parish water agreements, and LDEQ/LPSC records. Meta Hyperion has the most visible water-use record; Amazon has regional water-infrastructure commitments; Hut 8 and Applied Digital require site-level permit tracking.

Where do Louisiana secondary watch items and local policy actions live?

LouisianAI keeps unconfirmed site-control cases and parish or city policy moves off the canonical tracker until operator, permit, or utility records harden. The current dated holding surface covers Resilient Technology Park, State Line / Blanchard, the New Orleans data-center interim zoning district, and St. Charles Parish's data-center zoning code.

Secondary signals

Industrial AI signals live outside the campus table.

Bayou Metal's Slidell line for HII's AI-enabled ROMULUS unmanned surface vessel program is a Louisiana autonomy and manufacturing signal, not a data-center row. We track those items in the ecosystem Watch Wire until they become canonical campus, docket, or operator records.

Analytics

The buildout, visualized.

Interactive breakdowns of capex allocation, power demand, project status, parish concentration, and operator portfolios across all tracked Louisiana AI infrastructure.

Projects loaded
6
Aggregate capex
$80.9B
Aggregate MW
9,610 MW
Under construction
3
Confidence A+B
3
Capex by project
Meta Hyperion AI Data Center50.0B
Meta Platforms
Amazon NW Louisiana Cluster12.0B
Amazon / STACK
Hut 8 River Bend Campus10.0B
Hut 8
STACK Infrastructure Bossier4.5B
STACK Infrastructure
Delta Forge 13.6B
Applied Digital
Vantage East Bank800M
Vantage Data Centers
Peak MW demand by project
Meta Hyperion AI Data Center5,000
Meta Platforms
Amazon NW Louisiana Cluster~3,000
Amazon / STACK
STACK Infrastructure Bossier750
STACK Infrastructure
Delta Forge 1430
Applied Digital
Hut 8 River Bend Campus330
Hut 8
Vantage East Bank100
Vantage Data Centers
Status distribution
Under construction3 (50%)
Civil works1 (17%)
Announced1 (17%)
Rumoured1 (17%)
Confidence ladder
Grade A
0 projects
0%
Grade B
3 projects
50%
Grade C
2 projects
33%
Grade D
1 projects
17%
Operator portfolio
Meta Platforms1 project · $50.0B · 5,000 MW
Amazon / STACK1 project · $12.0B · 3,000 MW
Hut 81 project · $10.0B · 330 MW
STACK Infrastructure1 project · $4.5B · 750 MW
Applied Digital1 project · $3.6B · 430 MW
Vantage Data Centers1 project · $800M · 100 MW
Parish concentration
Richland1 project · 50.0B
5,000 MW
Caddo & Bossier1 project · 12.0B
3,000 MW
West Feliciana1 project · 10.0B
330 MW
Bossier1 project · 4.5B
750 MW
Rapides1 project · 3.6B
430 MW
East Baton Rouge1 project · 0.8B
100 MW
Tracking momentum by cohort year
20241 projects · $50.0B · 5,000 MW
20253 projects · $26.5B · 4,080 MW
20262 projects · $4.4B · 530 MW
Capex vs MW landscape
0M12.5B25.0B37.5B50.0B01,250 MW2,500 MW3,750 MW5,000 MWMeta Hyperion AI Data CenterAmazon NW Louisiana ClusterCapex (scaled)MW (scaled)
  • Meta Hyperion AI Data Center — Meta Platforms ($50B+, 5,000 MW, Under construction)
  • Amazon NW Louisiana Cluster — Amazon / STACK ($12B, ~3,000 MW, Announced)
  • Hut 8 River Bend Campus — Hut 8 ($10B, 330 MW, Under construction)
  • STACK Infrastructure Bossier — STACK Infrastructure ($4.5B, 750 MW, Civil works)
  • Delta Forge 1 — Applied Digital ($3.6B, 430 MW, Under construction)
  • Vantage East Bank — Vantage Data Centers ($800M, 100 MW, Rumoured)

Values use published tracker capex and MW fields.

Geography

Active build, in geography.