What is Amazon AWS Caddo Parish data center?
Amazon AWS Caddo Parish data center refers to the Caddo/Shreveport side of Amazon's $12 billion Amazon/STACK Northwest Louisiana data-center program. LouisianAI maps the Caddo Parish query to this canonical Amazon campus profile, the Amazon operator hub, the Caddo Parish hub, and SWEPCO power context until a public filing separates a Caddo-only site record from the linked Caddo+Bossier program.
What is Amazon AWS Bossier Parish data center?
Amazon AWS Bossier Parish data center refers to the Bossier Parish technology-park side of the same Amazon/STACK Northwest Louisiana program. LouisianAI tracks Bossier with Caddo as a linked Shreveport-Bossier campus cluster, with the Bossier Parish hub and this Amazon profile as the local canonical path until a public filing creates a separate Bossier-only project record.
What is the difference between Amazon Caddo and Bossier data centers?
The practical difference is geography and local permitting: Caddo Parish covers the Shreveport/Caddo side of the corridor, while Bossier Parish covers the Bossier technology-park side. The common controls are Amazon as the hyperscale customer, STACK as the campus/program context, AEP SWEPCO as the utility corridor, and Louisiana Economic Development/Amazon source material for jobs, water infrastructure, and community commitments.
Is the Amazon Louisiana data center in Caddo or Bossier Parish?
Amazon's Louisiana data-center program is tracked across both Caddo and Bossier parishes. The current canonical answer is a multi-parish Amazon/STACK Northwest Louisiana cluster, not a single-parish campus, because the public record still treats the program as linked Caddo and Bossier campuses.
Which utility powers Amazon's Louisiana data centers?
AEP SWEPCO powers Amazon's Caddo and Bossier Parish data-center campuses in northwest Louisiana. SWEPCO Louisiana data center searches should resolve to this Amazon/STACK Caddo+Bossier corridor, the power topic, and Caddo/Bossier parish hubs rather than Entergy's Meta Hyperion or Hut 8 River Bend dockets.
How many jobs will Amazon's Louisiana data centers create?
Amazon and Louisiana Economic Development project 540 direct permanent jobs at the Caddo and Bossier campuses plus 1,710 additional indirect full-time-equivalent roles in the regional economy.
What are Amazon Louisiana data center community benefits?
Amazon's public community-benefit stack includes the 540 direct permanent jobs, 1,710 indirect roles, up to $400 million in regional water-infrastructure commitments, and a $250,000 community fund for STEM education and local water-quality projects.
How big is Amazon AI Data Center Campuses?
Amazon AI Data Center Campuses is tracked at Verification needed and Verification needed, with Verification needed of power capacity where public sources support the number.
How many jobs will Amazon AI Data Center Campuses create?
Current tracked figures show 540 permanent jobs and 1,500 construction jobs, subject to source verification.
What is the PILOT agreement for Amazon AI Data Center Campuses?
A PILOT is a payment-in-lieu-of-taxes structure negotiated locally; this page tracks the public artifacts needed to compare ad-valorem exposure with negotiated payments.
When will Amazon AI Data Center Campuses come online?
Announced & preparing for groundbreak. Exact phase delivery dates remain tied to operator updates, utility milestones, parish permits, and regulatory filings.
Which parish is Amazon AI Data Center Campuses in?
Amazon AI Data Center Campuses is tracked in Caddo & Bossier Parishes, Louisiana.
Who is the operator of Amazon AI Data Center Campuses?
Amazon (with STACK Infrastructure) is the operator listed for Amazon AI Data Center Campuses.
How much water will Amazon AI Data Center Campuses use?
Water use is tracked as a verification item because definitive cooling and withdrawal figures usually appear in permits, utility exhibits, or operator environmental disclosures.
What incentives did Louisiana give Amazon (with STACK Infrastructure)?
Louisiana data-center incentives can include Act 730 sales/use tax treatment and local PILOT structures; the exact package should be verified against state, parish, and operator documents.
What power infrastructure serves Amazon AI Data Center Campuses?
The page tracks substations, transmission watch corridors, and utility filings as source-backed signals rather than engineering-grade interconnection maps.
Why does LouisianAI label confidence levels?
Confidence labels distinguish seed, reported, and verified claims so readers can separate early intelligence from document-backed facts.