Skip to main content
LIVEResearch desk operatingU-37425Entergy LA filing · 7.2 GW load additionRICHLANDHyperion phase 3 permit acceptedCADDOSTACK substation civil mobilisingW. FELICIANAHut 8 River Bend hearing 06/03
Arbitrary comparison workbench

Compare any mix of records, parishes, and operators.

Every column is a reader-selected entity; every row is a normalized dimension. Cells show the public value or an explicit not-in-public-record state, keep the per-dimension source count visible, and never roll up into a composite score. The URL carries the selection, so comparisons are shareable.

2 of 6 columns selected. The URL updates as you select, so any comparison can be shared or bookmarked.

Tracker records
Parishes (fans out to every tracked record in the parish)
Operators (fans out to every tracked record for the operator)
DimensionMeta Hyperion AI Data CenterTracker recordMeta Hyperion AI Data CenterAmazon Data Centers in Caddo & BossierTracker recordAmazon Data Centers in Caddo & Bossier
Evidence coverageDossier claim and linked-source counts. Depth of the public record, not a quality score.

5 claims · 8 linked sources

available8 sources

5 claims · 6 linked sources

available6 sources
Power posturePublished project-level MW on its disclosed basis; compute capacity, utility capacity, and utility design are not interchangeable.

5,000 MW · compute capacity (power profile: 111 fields, 27 not in public record)

available3 sources

Not in public record (power profile: 65 fields, 28 not in public record)

not in public record1 source
PermitsParish and site-control posture from the diligence catalyst record, plus tracked permit events when available.

Confirmed control record · 6 tracked permit events

available1 source

Meta Hyperion AI Data Center: Confirmed control record · 6 tracked permit events

Watch · 3 tracked permit events

partial

Amazon Data Centers in Caddo & Bossier: Watch · 3 tracked permit events

Water & environmentalWater and cooling posture from the diligence catalyst record, plus the water profile's public-record depth when available.

Confirmed control record · profile: 70 fields, 14 not in public record

available1 source

Meta Hyperion AI Data Center: Confirmed control record · profile: 70 fields, 14 not in public record

Confirmed control record · profile: 63 fields, 14 not in public record

available1 source

Amazon Data Centers in Caddo & Bossier: Confirmed control record · profile: 63 fields, 14 not in public record

IncentivesDesk-recorded incentive counterparties (LED, QJ, RPC, abatement). Source count reflects linked LED-authority records.

LED — Incentives · QJ + RPC

available

Not in public record

not in public record1 source
Timeline & eventsRegulatory milestones from project dossiers plus tracked timeline events when available.

2 regulatory milestones · 9 tracked timeline events

available2 sources

0 regulatory milestones · 4 tracked timeline events

available
Community exposureParishes touched with desk reference population and region. Population figures are desk reference data without a linked primary source.

Richland Parish · pop. 20,725 · Northeast Louisiana

available

2 parishes touched · pop. 237,848 / 126,837

available

Caddo Parish · pop. 237,848 · Northwest Louisiana Bossier Parish · pop. 126,837 · Northwest Louisiana

UncertaintyCount of fields explicitly not in the public record, per dimension. Higher means thinner public evidence, not a worse project.

41 fields not in public record

available

41 not in public record (dossier 0 · power 27 · water 14)

46 fields not in public record

available

46 not in public record (dossier 4 · power 28 · water 14)

Comparison generated 2026-09-24T02:38:55.263Z. Curated two-project pages remain at /compare/[pair]. Verify any material claim against the linked source record before reuse.

Transparent scenario tools

Edit the assumptions; read the arithmetic.

These calculators are input-driven sensitivity tools. Every default is a labeled assumption, every formula is shown, and every output is a scenario — not a factual determination about any project, parish, or taxpayer.

Taxable value / PILOT sensitivity

Edit the taxable value, millage, abatement share, and term to see the trade between abated payments and forgone revenue. Millage is a decimal rate (0.11 = 110 mills).

Gross annual tax
$110M / yr
Abated annual payment
$60.5M / yr
Annual abatement value
$49.5M / yr
Abatement value over term
$495M
Payments over term
$605M
Scenario — not a factual determination
  • Gross annual tax = taxable value × millage rate
  • Abated annual payment = gross annual tax × (1 − abatement %)
  • Annual abatement value = gross annual tax − abated annual payment
  • Term totals = annual figures × term years

Power ramp scenario

Edit contracted MW, ramp years, and curtailment to see implied annual deliverable energy. Ramp years assume a linear ramp at 50% average load.

Steady-state annual energy
4,380,000 MWh
Deliverable after curtailment
4,161,000 MWh / yr
Curtailed energy
219,000 MWh / yr
Average per ramp year (50% linear assumption)
2,080,500 MWh / yr
Total over ramp period
6,241,500 MWh
Scenario — not a factual determination
  • Steady-state annual energy = contracted MW × 8,760 hours
  • Deliverable annual energy = steady-state × (1 − curtailment %)
  • Curtailed energy = steady-state − deliverable
  • Ramp years assume a linear ramp: average 50% of deliverable energy per ramp year