Compare Louisiana data centers vs other states.
Start with Louisiana vs Texas incentives or Louisiana vs Mississippi investment, or compare Meta Hyperion vs Amazon. Then mix any tracked records, parishes, and operators. Cells show the public value or an explicit not-in-public-record state, keep the per-dimension source count visible, and never roll up into a composite score.
2 of 6 columns selected. The URL updates as you select, so any comparison can be shared or bookmarked.
| Dimension | Meta Hyperion AI Data CenterTracker recordMeta Hyperion AI Data Center | Amazon Data Centers in Caddo & BossierTracker recordAmazon Data Centers in Caddo & Bossier |
|---|---|---|
| Evidence coverageDossier claim and linked-source counts. Depth of the public record, not a quality score. | 5 claims · 8 linked sources available8 sources | 5 claims · 7 linked sources available7 sources |
| Power posturePublished project-level MW on its disclosed basis; compute capacity, utility capacity, and utility design are not interchangeable. | 5,000 MW · compute capacity (power profile: 111 fields, 27 not in public record) available3 sources | Not in public record (power profile: 65 fields, 28 not in public record) not in public record1 source |
| PermitsParish and site-control posture from the diligence catalyst record, plus tracked permit events when available. | Confirmed control record · 6 tracked permit events available1 source Meta Hyperion AI Data Center: Confirmed control record · 6 tracked permit events | Watch · 3 tracked permit events partial Amazon Data Centers in Caddo & Bossier: Watch · 3 tracked permit events |
| Water & environmentalWater and cooling posture from the diligence catalyst record, plus the water profile's public-record depth when available. | Confirmed control record · profile: 70 fields, 14 not in public record available1 source Meta Hyperion AI Data Center: Confirmed control record · profile: 70 fields, 14 not in public record | Confirmed control record · profile: 61 fields, 17 not in public record available1 source Amazon Data Centers in Caddo & Bossier: Confirmed control record · profile: 61 fields, 17 not in public record |
| IncentivesDesk-recorded incentive counterparties (LED, QJ, RPC, abatement). Source count reflects linked LED-authority records. | LED — Incentives · QJ + RPC available | Not in public record not in public record1 source |
| Timeline & eventsRegulatory milestones from project dossiers plus tracked timeline events when available. | 2 regulatory milestones · 9 tracked timeline events available2 sources | 0 regulatory milestones · 4 tracked timeline events available |
| Community exposureParishes touched with desk reference population and region. Population figures are desk reference data without a linked primary source. | Richland Parish · pop. 20,725 · Northeast Louisiana available | 2 parishes touched · pop. 237,848 / 126,837 available Caddo Parish · pop. 237,848 · Northwest Louisiana Bossier Parish · pop. 126,837 · Northwest Louisiana |
| UncertaintyCount of fields explicitly not in the public record, per dimension. Higher means thinner public evidence, not a worse project. | 41 fields not in public record available 41 not in public record (dossier 0 · power 27 · water 14) | 49 fields not in public record available 49 not in public record (dossier 4 · power 28 · water 17) |
Comparison generated 2026-11-09T02:40:09.183Z. Curated two-project pages remain at /compare/[pair]. Verify any material claim against the linked source record before reuse.
Edit the assumptions; read the arithmetic.
These calculators are input-driven sensitivity tools. Every default is a labeled assumption, every formula is shown, and every output is a scenario — not a factual determination about any project, parish, or taxpayer.
Taxable value / PILOT sensitivity
Edit the taxable value, millage, abatement share, and term to see the trade between abated payments and forgone revenue. Millage is a decimal rate (0.11 = 110 mills).
- Gross annual tax
- $110M / yr
- Abated annual payment
- $60.5M / yr
- Annual abatement value
- $49.5M / yr
- Abatement value over term
- $495M
- Payments over term
- $605M
- Gross annual tax = taxable value × millage rate
- Abated annual payment = gross annual tax × (1 − abatement %)
- Annual abatement value = gross annual tax − abated annual payment
- Term totals = annual figures × term years
Power ramp scenario
Edit contracted MW, ramp years, and curtailment to see implied annual deliverable energy. Ramp years assume a linear ramp at 50% average load.
- Steady-state annual energy
- 4,380,000 MWh
- Deliverable after curtailment
- 4,161,000 MWh / yr
- Curtailed energy
- 219,000 MWh / yr
- Average per ramp year (50% linear assumption)
- 2,080,500 MWh / yr
- Total over ramp period
- 6,241,500 MWh
- Steady-state annual energy = contracted MW × 8,760 hours
- Deliverable annual energy = steady-state × (1 − curtailment %)
- Curtailed energy = steady-state − deliverable
- Ramp years assume a linear ramp: average 50% of deliverable energy per ramp year
Compare records, then open the matching hubs
Parish hearing and public-meeting queries belong on the parish permit pages. Statewide jobs, news, and policy live on the dedicated hubs.
- Louisiana AI jobs and training
- Louisiana AI events and convenings
- Louisiana AI companies and startups
- Louisiana AI news and weekly briefs
- Louisiana AI research and university labs
- Louisiana AI policy and LPSC filings
- Statewide Louisiana AI overview
- Louisiana AI infrastructure briefs
- West Feliciana Parish data center permits and hearings