The edition-stamped snapshot of Louisiana’s AI data center buildout: source-backed capex, published site power by build stage, parish scorecard, operator portfolio, and the LPSC docket pulse. Campus records and multi-campus programs are counted once; watch rows and enabling grid projects are shown separately rather than folded into statewide campus totals.

Edition Q3 2026Published 2026-07-284 core records · 2 watch rows
Headline, this edition
Disclosed-capex floor
$65.6B+
Published site MW
5,760
Named campuses
3
Parishes
5
LPSC dockets open
3 / 5
Build stage

MW by stage of build.

Active build

3 projects
5,760 MW
$53.6B+ disclosed-capex floor · plus $10.0B stated ceiling

Under construction or civil works in motion.

Announced & permitting

1 project
0 MW
$12.0B disclosed-capex floor

Announced, permitting, or site acquired — not yet building.

Watch list

2 projects
0 MW
$0M disclosed-capex floor

Potential subsite or rumour-grade signal; excluded from every statewide denominator.

Parish scorecard

Where the capex lands.

Amazon/STACK is one disclosed multi-campus program spanning Caddo and Bossier. It is shown once below rather than allocated to either parish, so the index counts five covered parishes without double-counting its $12B program investment or inventing a split MW figure.

ParishProjectsDisclosed capexQuantified MWOperators
Richland1$50.0B+5,000Meta Platforms
Caddo & Bossier1$12.0BAmazon / STACK
Rapides1$3.6B430Applied Digital
West Feliciana1$0M+ $10.0B ceiling330Hut 8
Operator portfolio

Who is building.

Meta Platforms

1 project · $50.0B+ · 5,000 MW
Under construction

Amazon / STACK

1 project · $12.0B
Announced

Applied Digital

1 project · $3.6B · 430 MW
Under construction

Hut 8

1 project · $0M + $10.0B ceiling · 330 MW
Under construction
Direct answers

What is the Louisiana AI Infrastructure Index?

The Louisiana AI Infrastructure Index is LouisianAI's edition-stamped quarterly snapshot of the state's AI data center buildout. The Q3 2026 edition separates 4 source-backed data-center records (3 named campuses and 1 multi-campus program) from 2 visible watch-list rows. Statewide capex, published site power, parish, and operator figures use only the source-backed denominator.

How much Louisiana data center capex does the index track?

The Q3 2026 edition tracks a $65.6B+ disclosed-capex floor: $53.6B+ in named campus records and $12.0B in the Amazon/STACK multi-campus program, counted once. Hut 8's separately disclosed up-to-$10.0B Phase I ceiling remains outside that floor. Watch rows and enabling grid projects are excluded.

How many MW of Louisiana AI data center load is in active construction?

5,760 MW of published site power sits in active build, with another 0 MW in announced or permitting records. The core register has 5,760 MW across 3 records; Amazon's $12B multi-campus program has no public MW figure, and enabling grid generation is tracked separately through LPSC dockets.

Which parishes lead the Louisiana AI buildout?

The index covers 5 parishes with confirmed projects. The parish scorecard ranks them by tracked capex; the current edition is led by Richland.

What LPSC dockets does the index follow?

The regulatory pulse covers 5 tracked LPSC docket records: 3 open, 1 approved, and 1 repository, last verified 2026-08-05. Each has a citable record page under /lpsc-dockets.

How should the Louisiana AI Infrastructure Index be cited?

Cite it as "Louisiana AI Infrastructure Index, Q3 2026 edition, LouisianAI, published 2026-07-28, louisianai.com/louisiana-ai-infrastructure-index." Underlying rows are available as CSV and JSON datasets, and every project metric links back to its source-linked profile.

Methodology

Derived, not restated.

Index metrics are computed directly from LouisianAI’s source-linked tracker rows and LPSC docket records at publication — the same records behind every project profile. Capex and MW reflect row-level tracked values, not aggregated press claims; rumour-grade rows are reported separately from confirmed campuses. See the methodology page for confidence grading.

Suggested citation: “Louisiana AI Infrastructure Index, Q3 2026 edition, LouisianAI, published 2026-07-28, louisianai.com/louisiana-ai-infrastructure-index.”

Get the data