Quarterly data product

Louisiana AI Infrastructure Index.

The edition-stamped snapshot of Louisiana’s AI data center buildout: capex, quantified MW by build stage, parish scorecard, operator portfolio, and the LPSC docket pulse. Every number derives from the same source-linked tracker rows — nothing is restated by hand.

Edition Q2 2026Published 2026-06-096 tracker rows
Headline, this edition
Tracked capex
$39.3B
Quantified peak MW
7,350
Confirmed campuses
5
Parishes
5
LPSC dockets open
2 / 4
Build stage

MW by stage of build.

Active build

2 projects
2,750 MW
$14.5B tracked capex

Under construction or civil works in motion.

Announced & permitting

3 projects
4,500 MW
$24.0B tracked capex

Announced, permitting, or site acquired — not yet building.

Rumour-grade

1 project
100 MW
$800M tracked capex

Tracked from supplier RFPs only; excluded from confirmed counts.

Parish scorecard

Where the capex lands.

ParishProjectsTracked capexQuantified MWOperators
Caddo & Bossier1$12.0B3,000Amazon / STACK
Richland1$10.0B2,000Meta Platforms
West Feliciana1$10.0B1,500Hut 8
Bossier1$4.5B750STACK Infrastructure
Rapides1$2.0BApplied Digital
East Baton Rouge1$800M100Vantage Data Centers
Operator portfolio

Who is building.

Amazon / STACK

1 project · $12.0B · 3,000 MW
Announced

Meta Platforms

1 project · $10.0B · 2,000 MW
Under construction

Hut 8

1 project · $10.0B · 1,500 MW
Permitting

STACK Infrastructure

1 project · $4.5B · 750 MW
Civil works

Applied Digital

1 project · $2.0B
Site acquired

Vantage Data Centers

1 project · $800M · 100 MW
Rumoured
Direct answers

What is the Louisiana AI Infrastructure Index?

The Louisiana AI Infrastructure Index is LouisianAI's edition-stamped quarterly snapshot of the state's AI data center buildout. The Q2 2026 edition aggregates 6 source-linked tracker rows into capex, MW, build-stage, parish, operator, and LPSC docket summaries. Every number derives from the same per-project records published on the tracker.

How much Louisiana data center capex does the index track?

The Q2 2026 edition tracks $39.3B of row-level, source-linked project capex across 6 tracked projects (5 confirmed campuses plus rumour-grade rows).

How many MW of Louisiana AI data center load is in active construction?

2,750 MW of quantified peak demand sits in active build (under construction or civil works), with another 4,500 MW announced or in permitting. Quantified tracker rows sum to 7,350 MW.

Which parishes lead the Louisiana AI buildout?

The index covers 5 parishes with confirmed projects. The parish scorecard ranks them by tracked capex; the current edition is led by Caddo & Bossier.

What LPSC dockets does the index follow?

The regulatory pulse covers 4 tracked LPSC docket records: 2 open, 1 approved, and 1 repository, last verified 2026-05-15. Each has a citable record page under /lpsc-dockets.

How should the Louisiana AI Infrastructure Index be cited?

Cite it as "Louisiana AI Infrastructure Index, Q2 2026 edition, LouisianAI, published 2026-06-09, louisianai.com/louisiana-ai-infrastructure-index." Underlying rows are available as CSV and JSON datasets, and every project metric links back to its source-linked profile.

Methodology

Derived, not restated.

Index metrics are computed directly from LouisianAI’s source-linked tracker rows and LPSC docket records at publication — the same records behind every project profile. Capex and MW reflect row-level tracked values, not aggregated press claims; rumour-grade rows are reported separately from confirmed campuses. See the methodology page for confidence grading.

Suggested citation: “Louisiana AI Infrastructure Index, Q2 2026 edition, LouisianAI, published 2026-06-09, louisianai.com/louisiana-ai-infrastructure-index.”