{"version":"2026.05.11","count":6,"projects":[{"slug":"meta-hyperion-ai-data-center","name":"Meta Hyperion AI Data Center","operator":"Meta Platforms","operator_slug":"meta","parish":"Richland","parish_slug":"richland","utility":"Entergy LA","status":"Under construction","phase":"Phase II","capex_label":"$10B+","capex_millions":10000,"mw_label":"2,000","mw":2000,"sqft_label":"4M+","confidence":"B","acreage":"2,250 ac","first_tracked":"2024-12-09"},{"slug":"amazon-ai-data-center-campuses","name":"Amazon NW Louisiana Cluster","operator":"Amazon / STACK","operator_slug":"amazon","parish":"Caddo & Bossier","parish_slug":"caddo","utility":"SWEPCO","status":"Announced","phase":"Pre-civil","capex_label":"$12B","capex_millions":12000,"mw_label":"~3,000","mw":3000,"sqft_label":"TBD","confidence":"B","acreage":"1,400 ac","first_tracked":"2025-02-04"},{"slug":"hut-8-river-bend-ai-data-center-campus","name":"Hut 8 River Bend Campus","operator":"Hut 8","operator_slug":"hut-8","parish":"West Feliciana","parish_slug":"west-feliciana","utility":"Entergy LA","status":"Permitting","phase":"Phase I","capex_label":"$10B","capex_millions":10000,"mw_label":"1,500","mw":1500,"sqft_label":"1.6M","confidence":"C","acreage":"611 ac","first_tracked":"2025-05-22"},{"slug":"applied-digital-project-lightning","name":"Applied Digital Lightning","operator":"Applied Digital","operator_slug":"applied-digital","parish":"Rapides","parish_slug":"rapides","utility":"Cleco","status":"Site acquired","phase":"Site work","capex_label":"$2B+","capex_millions":2000,"mw_label":"TBV","mw":null,"sqft_label":"672 ac","confidence":"C","acreage":"672 ac","first_tracked":"2026-01-19"},{"slug":"stack-infrastructure-bossier","name":"STACK Infrastructure Bossier","operator":"STACK Infrastructure","operator_slug":"stack-infrastructure","parish":"Bossier","parish_slug":"bossier","utility":"SWEPCO","status":"Civil works","phase":"Phase I","capex_label":"$4.5B","capex_millions":4500,"mw_label":"750","mw":750,"sqft_label":"1.2M","confidence":"B","acreage":"880 ac","first_tracked":"2025-08-14"},{"slug":"vantage-east-bank","name":"Vantage East Bank","operator":"Vantage Data Centers","operator_slug":"vantage","parish":"East Baton Rouge","parish_slug":"east-baton-rouge","utility":"Entergy LA","status":"Rumoured","phase":"Site search","capex_label":"$800M","capex_millions":800,"mw_label":"100","mw":100,"sqft_label":"TBD","confidence":"D","acreage":"—","first_tracked":"2026-04-16"}]}