{"version":"2026.09.25","contract_version":"2026.09.23.1","data_as_of":"2026-08-05","count":6,"summary":{"metrics":{"capital_floor":{"amount_millions":65600,"label":"$65.6B+","methodology":"$65.6B+ — Source-supported capital floor; excludes upper-bound-only projects.","included_record_count":3,"lower_bound_record_count":1,"upper_bound_record_count":1,"upper_bound_millions_excluded":10000},"published_site_power":{"mw":5760,"quantified_record_count":3,"undisclosed_record_count":1,"methodology":"Published project-level MW is retained on its disclosed basis; utility capacity, utility design, and compute capacity are not normalized into a common measure. The optional power_detail block models requested, contracted, design, utility-deliverable, critical-IT, and in-service load bases separately; those bases are never summed or aggregated into a single MW figure."}},"denominators":{"all_tracker_records":{"count":6,"label":"all tracked records, including visibly labeled watch rows"},"core_records":{"count":4,"label":"source-backed named campuses and multi-campus programs"},"capital_floor_records":{"count":3,"label":"reported amounts or stated lower bounds; excludes upper-bound-only projects"},"published_power_records":{"count":3,"label":"core records with a published project-level MW figure"}}},"projects":[{"record_id":"louisianai:infrastructure:meta-hyperion-ai-data-center","slug":"meta-hyperion","legacy_slug":"meta-hyperion-ai-data-center","canonical_slug":"meta-hyperion","name":"Meta Hyperion AI Data Center","operator":"Meta Platforms","operator_slug":"meta","parish":"Richland","parish_slug":"richland","parish_slugs":["richland"],"utility":"Entergy LA","status":"Under construction","phase":"Phase II review","record_kind":"campus","capex_label":"$50B+","capex_millions":50000,"capex_disclosure":"lower-bound","included_in_statewide_capex_floor":true,"mw_label":"5,000","mw":5000,"power_basis":"compute-capacity","power_detail":{"slug":"meta-hyperion-ai-data-center","projectName":"Meta Hyperion AI Data Center","utility":"Entergy LA","requestedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"contractedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"designedMw":{"mw":5000,"label":"Announced campus build-out scale — 5 GW on Meta's compute-capacity basis, per the July 13, 2026 Meta announcement and Entergy's description of a campus with the potential to scale up to 5 GW","state":"confirmed","source":{"publisher":"Meta","title":"Teachers and Local Businesses Win as Meta Expands Louisiana Data Center","url":"https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/","published":"2026-07-13"},"asOf":"2026-07-13"},"utilityDeliverableMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"criticalItMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"inServiceMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"agreements":[{"name":"Phase 1 generation and transmission service package (Laidley LLC)","parties":["Entergy Louisiana","Laidley LLC (Meta Platforms)"],"status":"Approved — settlement approved at the August 20, 2025 LPSC Business and Executive Session; order document dated August 29, 2025","date":"2025-08-29","sourceUrl":"https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/DocketDetails?docketId=32146","docketRef":"U-37425"},{"name":"Expansion certification — Project Evest (Evest LLC)","parties":["Entergy Louisiana","Evest LLC (Meta Platforms)"],"status":"Open — LPSC certification proceeding; Commission consideration scheduled for the December 16, 2026 Business and Executive Session","date":"2026-03-26","sourceUrl":"https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/DocketDetails?docketId=32728","docketRef":"U-37882"},{"name":"Additional Entergy–Meta expansion agreement","parties":["Entergy Louisiana","Meta Platforms"],"status":"Announced — structured so Meta pays its full cost of service; first project submitted under the LPSC Lightning Amendment, with certification pending in U-37882","date":null,"sourceUrl":"https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings"}],"queuePosition":{"position":null,"state":"not-in-public-record","note":"Entergy Louisiana large-load service is certified through LPSC dockets rather than a published interconnection queue, so no public queue position exists for this campus.","source":null},"substationDependencies":[],"transmissionDependencies":[{"label":"Approximately 240 miles of new 500 kV transmission connecting South Louisiana to North Louisiana and Arkansas (Meta-funded; certification pending in U-37882)","state":"reported","source":{"publisher":"Entergy","title":"Entergy Louisiana announces a new agreement with Meta that will deliver an additional $2B in customer savings","url":"https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings"}}],"generationStorageDependencies":[{"label":"Seven new natural-gas combined-cycle plants totaling more than 5,200 MW, Meta-funded; certification pending in U-37882","state":"reported","source":{"publisher":"Entergy","title":"Entergy Louisiana announces a new agreement with Meta that will deliver an additional $2B in customer savings","url":"https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings"}},{"label":"Battery energy storage across three locations","state":"reported","source":{"publisher":"Entergy","title":"Entergy Louisiana announces a new agreement with Meta that will deliver an additional $2B in customer savings","url":"https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings"}},{"label":"Nuclear power uprates","state":"reported","source":{"publisher":"Entergy","title":"Entergy Louisiana announces a new agreement with Meta that will deliver an additional $2B in customer savings","url":"https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings"}},{"label":"Up to 2,500 MW of new renewable resources with Meta funding support","state":"reported","source":{"publisher":"Entergy","title":"Entergy Louisiana announces a new agreement with Meta that will deliver an additional $2B in customer savings","url":"https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings"}}],"energizationDates":[{"label":"Phase I initial energization","date":null,"status":"Not in public record — energization timing is tracked through U-37425 compliance filings rather than a published date","source":null},{"label":"LPSC certification consideration for the expansion package (U-37882)","date":"2026-12-16","status":"Scheduled Commission Business and Executive Session — a regulatory milestone, not an energization date","source":{"publisher":"Louisiana Public Service Commission","title":"U-37882 — Entergy Louisiana certification of generation and transmission resources and other relief for Meta expansion","url":"https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/DocketDetails?docketId=32728","published":"2026-03-27"}}],"rateTariffPosture":{"summary":"Entergy Louisiana's Fair Share Plus pledge structures the service so Meta pays its full cost of service. Entergy states the two Meta agreements are expected to deliver approximately $2.65 billion in combined customer benefits over 20 years — $650 million from the first agreement plus about $2 billion from the expansion agreement. The expansion is the first filing under the LPSC's Lightning Amendment large-load framework.","tariffRefs":["U-37425","U-37882","X-37921"],"source":{"publisher":"Entergy","title":"Entergy Louisiana announces a new agreement with Meta that will deliver an additional $2B in customer savings","url":"https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings"},"state":"reported"},"curtailmentRisk":{"level":"unknown","basis":"No interruptibility, curtailment, or demand-response terms for this load appear in the reviewed public record; the risk is not assessed rather than assumed low.","source":null},"methodology":"Load bases are modeled separately and are never summed, averaged, or normalized into a single MW figure. Any basis without a named public source is recorded as not-in-public-record rather than estimated.","lastVerified":"2026-09-23","nextReviewBy":"2026-12-22"},"sqft_label":"4M+","confidence":"B","acreage":"2,250 ac","first_tracked":"2024-12-09","source_published_at":"2026-07-13","last_verified":"2026-08-05","next_review_by":"2026-10-05","display_state":"current","profile_path":"/data-centers/meta-hyperion","canonical_path":"/data-centers/meta-hyperion","has_dedicated_profile":true,"sources":[{"publisher":"Meta","title":"Teachers and Local Businesses Win as Meta Expands Louisiana Data Center","url":"https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/","published":"2026-07-13"}]},{"record_id":"louisianai:infrastructure:amazon-ai-data-center-campuses","slug":"amazon-ai-data-center-campuses","legacy_slug":null,"canonical_slug":"amazon-ai-data-center-campuses","name":"Amazon Data Centers in Caddo & Bossier","operator":"Amazon / STACK","operator_slug":"amazon","parish":"Caddo & Bossier","parish_slug":"caddo","parish_slugs":["caddo","bossier"],"utility":"SWEPCO","status":"Announced","phase":"Plat approved","record_kind":"program","capex_label":"$12B","capex_millions":12000,"capex_disclosure":"reported","included_in_statewide_capex_floor":true,"mw_label":"Not publicly disclosed","mw":null,"power_basis":null,"power_detail":{"slug":"amazon-ai-data-center-campuses","projectName":"Amazon Data Centers in Caddo & Bossier","utility":"SWEPCO","requestedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"contractedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"designedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"utilityDeliverableMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"criticalItMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"inServiceMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"agreements":[],"queuePosition":{"position":null,"state":"not-in-public-record","note":"SWEPCO (AEP) serves the Caddo/Bossier corridor; no public interconnection queue position has been disclosed for the program.","source":null},"substationDependencies":[{"label":"Project-specific substation and specialized-equipment upgrades — customer-funded under LPSC oversight; no named facilities or MW disclosed","state":"reported","source":{"publisher":"SWEPCO","title":"New Data Center Announced; SWEPCO Role Cited in Supporting Local Economic Growth","url":"https://www.aep.com/news/stories/view/10770/","published":"2026-02-23"}}],"transmissionDependencies":[{"label":"Project-specific transmission-line improvements — customer-funded under LPSC oversight; no named facilities or MW disclosed","state":"reported","source":{"publisher":"SWEPCO","title":"New Data Center Announced; SWEPCO Role Cited in Supporting Local Economic Growth","url":"https://www.aep.com/news/stories/view/10770/","published":"2026-02-23"}}],"generationStorageDependencies":[],"energizationDates":[],"rateTariffPosture":{"summary":"SWEPCO states that all costs of the new facilities serving Amazon's campuses — including substations, transmission lines, and specialized equipment — are funded by Amazon under LPSC oversight and will not be passed on to existing customers. Amazon separately states it pays 100% of the costs of the energy infrastructure and upgrades required to serve the campuses. No project-specific tariff docket has been identified in the reviewed record.","tariffRefs":[],"source":{"publisher":"SWEPCO","title":"New Data Center Announced; SWEPCO Role Cited in Supporting Local Economic Growth","url":"https://www.aep.com/news/stories/view/10770/","published":"2026-02-23"},"state":"reported"},"curtailmentRisk":{"level":"unknown","basis":"No interruptibility, curtailment, or demand-response terms for this load appear in the reviewed public record; the risk is not assessed rather than assumed low.","source":null},"methodology":"Load bases are modeled separately and are never summed, averaged, or normalized into a single MW figure. Any basis without a named public source is recorded as not-in-public-record rather than estimated.","lastVerified":"2026-09-23","nextReviewBy":"2026-12-22"},"sqft_label":"TBD","confidence":"B","acreage":"1,400 ac","first_tracked":"2025-02-04","source_published_at":"2026-02-23","last_verified":"2026-08-05","next_review_by":"2026-09-05","display_state":"current","profile_path":"/data-centers/amazon-ai-data-center-campuses","canonical_path":"/data-centers/amazon-ai-data-center-campuses","has_dedicated_profile":true,"sources":[{"publisher":"STACK Infrastructure","title":"STACK Infrastructure Announces Data Center Developments Supporting Economic Growth in Louisiana","url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","published":"2026-02-23"},{"publisher":"Amazon","title":"How Amazon is investing in Louisiana","url":"https://www.aboutamazon.com/news/community/amazon-investment-louisiana-jobs-infrastructure-small-business"}]},{"record_id":"louisianai:infrastructure:hut-8-river-bend-ai-data-center-campus","slug":"hut-8-river-bend-ai-data-center-campus","legacy_slug":null,"canonical_slug":"hut-8-river-bend-ai-data-center-campus","name":"Hut 8 River Bend Data Center","operator":"Hut 8","operator_slug":"hut-8","parish":"West Feliciana","parish_slug":"west-feliciana","parish_slugs":["west-feliciana"],"utility":"Entergy LA","status":"Under construction","phase":"Phase I buildout","record_kind":"campus","capex_label":"Up to $10B","capex_millions":10000,"capex_disclosure":"upper-bound","included_in_statewide_capex_floor":false,"mw_label":"330","mw":330,"power_basis":"utility-capacity","power_detail":{"slug":"hut-8-river-bend-ai-data-center-campus","projectName":"Hut 8 River Bend Data Center","utility":"Entergy LA","requestedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"contractedMw":{"mw":245,"label":"Anchor offtake — Fluidstack long-term lease covering 245 MW of critical IT capacity, with a Google financial backstop on lease and pass-through obligations","state":"confirmed","source":{"publisher":"Louisiana Economic Development","title":"Hut 8 Selects Southeast Louisiana as Site of $10 Billion Artificial Intelligence Data Center","url":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","published":"2025-12-17"},"asOf":"2025-12-17"},"designedMw":{"mw":1000,"label":"Company-stated expansion ceiling — the campus has the potential to scale to up to 1,000 MW of utility capacity; an upper-bound potential, not a committed figure","state":"reported","source":{"publisher":"Hut 8","title":"River Bend","url":"https://www.hut8.com/data-centers/river-bend"},"asOf":"2026-09-23"},"utilityDeliverableMw":{"mw":330,"label":"Initial Entergy Louisiana utility capacity committed to the campus","state":"confirmed","source":{"publisher":"Louisiana Economic Development","title":"Hut 8 Selects Southeast Louisiana as Site of $10 Billion Artificial Intelligence Data Center","url":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","published":"2025-12-17"},"asOf":"2025-12-17"},"criticalItMw":{"mw":245,"label":"Critical IT load supported by the initial 330 MW of utility capacity (Fluidstack)","state":"confirmed","source":{"publisher":"Louisiana Economic Development","title":"Hut 8 Selects Southeast Louisiana as Site of $10 Billion Artificial Intelligence Data Center","url":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","published":"2025-12-17"},"asOf":"2025-12-17"},"inServiceMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"agreements":[{"name":"Fluidstack anchor offtake (Phase I)","parties":["Hut 8","Fluidstack"],"status":"Executed — long-term lease with a Google financial backstop covering lease and related pass-through obligations","date":"2025-12-17","sourceUrl":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center"},{"name":"Entergy Louisiana initial utility service (330 MW)","parties":["Entergy Louisiana","Hut 8"],"status":"Announced — initial 330 MW of utility capacity supporting 245 MW of critical IT load; no project-specific LPSC docket identified in the reviewed record","date":"2025-12-17","sourceUrl":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center"}],"queuePosition":{"position":null,"state":"not-in-public-record","note":"Entergy Louisiana large-load service is certified through LPSC dockets rather than a published interconnection queue, so no public queue position exists for this campus.","source":null},"substationDependencies":[],"transmissionDependencies":[],"generationStorageDependencies":[],"energizationDates":[{"label":"Phase I operations commencement","date":null,"status":"Targeted — operations expected to commence by Q2 2027 per the LED announcement","source":{"publisher":"Louisiana Economic Development","title":"Hut 8 Selects Southeast Louisiana as Site of $10 Billion Artificial Intelligence Data Center","url":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","published":"2025-12-17"}}],"rateTariffPosture":{"summary":"No project-specific LPSC docket or tariff filing was identified in the reviewed public record; power terms sit in the announced Entergy service arrangement. The statewide large-load guidelines repository (X-37921) frames any future filing.","tariffRefs":["X-37921"],"source":null,"state":"not-in-public-record"},"curtailmentRisk":{"level":"unknown","basis":"No interruptibility, curtailment, or demand-response terms for this load appear in the reviewed public record; the risk is not assessed rather than assumed low.","source":null},"methodology":"Load bases are modeled separately and are never summed, averaged, or normalized into a single MW figure. Any basis without a named public source is recorded as not-in-public-record rather than estimated.","lastVerified":"2026-09-23","nextReviewBy":"2026-12-22"},"sqft_label":"1.6M","confidence":"C","acreage":"627 ac","first_tracked":"2025-05-22","source_published_at":"2025-12-17","last_verified":"2026-08-05","next_review_by":"2026-09-05","display_state":"current","profile_path":"/data-centers/hut-8-river-bend-ai-data-center-campus","canonical_path":"/data-centers/hut-8-river-bend-ai-data-center-campus","has_dedicated_profile":true,"sources":[{"publisher":"Hut 8","title":"River Bend","url":"https://www.hut8.com/data-centers/river-bend"},{"publisher":"Louisiana Economic Development","title":"Hut 8 Selects Southeast Louisiana as Site of $10 Billion Artificial Intelligence Data Center","url":"https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center","published":"2025-12-17"}]},{"record_id":"louisianai:infrastructure:applied-digital-project-lightning","slug":"delta-forge-1","legacy_slug":"applied-digital-project-lightning","canonical_slug":"delta-forge-1","name":"Delta Forge 1","operator":"Applied Digital","operator_slug":"applied-digital","parish":"Rapides","parish_slug":"rapides","parish_slugs":["rapides"],"utility":"Cleco","status":"Under construction","phase":"Delta Forge 1","record_kind":"campus","capex_label":"$3.6B","capex_millions":3600,"capex_disclosure":"reported","included_in_statewide_capex_floor":true,"mw_label":"430","mw":430,"power_basis":"utility-design","power_detail":{"slug":"applied-digital-project-lightning","projectName":"Delta Forge 1","utility":"Cleco","requestedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"contractedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"designedMw":{"mw":430,"label":"Initial campus design — 430 MW of total utility power across two buildings (utility-design basis), with the ability to scale in 2028 and beyond","state":"confirmed","source":{"publisher":"Applied Digital","title":"Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus","url":"https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai","published":"2026-01-22"},"asOf":"2026-01-22"},"utilityDeliverableMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"criticalItMw":{"mw":300,"label":"Up to 300 MW of critical IT load, delivered through two initial 150 MW facilities","state":"confirmed","source":{"publisher":"Applied Digital","title":"Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus","url":"https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai","published":"2026-01-22"},"asOf":"2026-01-22"},"inServiceMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"agreements":[],"queuePosition":{"position":null,"state":"not-in-public-record","note":"Cleco is the serving utility of record; no public interconnection queue position has been disclosed for the campus.","source":null},"substationDependencies":[],"transmissionDependencies":[],"generationStorageDependencies":[],"energizationDates":[{"label":"Initial operations (Delta Forge 1)","date":null,"status":"Targeted — initial operations expected to commence mid-2027 (company statement)","source":{"publisher":"Applied Digital","title":"Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus","url":"https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai","published":"2026-01-22"}}],"rateTariffPosture":{"summary":"Cleco is the confirmed serving utility per the desk record; no project-specific LPSC docket or tariff approval was identified in the reviewed public record.","tariffRefs":[],"source":null,"state":"not-in-public-record"},"curtailmentRisk":{"level":"unknown","basis":"No interruptibility, curtailment, or demand-response terms for this load appear in the reviewed public record; the risk is not assessed rather than assumed low.","source":null},"methodology":"Load bases are modeled separately and are never summed, averaged, or normalized into a single MW figure. Any basis without a named public source is recorded as not-in-public-record rather than estimated.","lastVerified":"2026-09-23","nextReviewBy":"2026-12-22"},"sqft_label":"Not disclosed","confidence":"C","acreage":"672 ac","first_tracked":"2026-01-19","source_published_at":"2026-05-26","last_verified":"2026-08-05","next_review_by":"2026-09-05","display_state":"current","profile_path":"/data-centers/delta-forge-1","canonical_path":"/data-centers/delta-forge-1","has_dedicated_profile":true,"sources":[{"publisher":"Louisiana Economic Development","title":"Central Louisiana Secures $3.6 Billion Applied Digital AI Factory Campus","url":"https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus","published":"2026-05-26"},{"publisher":"Applied Digital","title":"Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus","url":"https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai","published":"2026-01-22"}]},{"record_id":"louisianai:infrastructure:stack-infrastructure-bossier","slug":"stack-infrastructure-bossier","legacy_slug":null,"canonical_slug":"stack-infrastructure-bossier","name":"STACK Bossier site context","operator":"STACK Infrastructure","operator_slug":"stack-infrastructure","parish":"Bossier","parish_slug":"bossier","parish_slugs":["bossier"],"utility":"SWEPCO","status":"Watch","phase":"Not independently disclosed","record_kind":"watch","capex_label":"Not separately disclosed","capex_millions":0,"capex_disclosure":"not-disclosed","included_in_statewide_capex_floor":false,"mw_label":"Not separately disclosed","mw":null,"power_basis":null,"power_detail":{"slug":"stack-infrastructure-bossier","projectName":"STACK Bossier site context","utility":"SWEPCO","requestedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"contractedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"designedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"utilityDeliverableMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"criticalItMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"inServiceMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"agreements":[],"queuePosition":{"position":null,"state":"not-in-public-record","note":"Watch row: the site is tracked as potential context within the Amazon/STACK northwest Louisiana program; no site-specific queue or service terms are public.","source":null},"substationDependencies":[],"transmissionDependencies":[],"generationStorageDependencies":[],"energizationDates":[],"rateTariffPosture":{"summary":"No site-specific power, tariff, or service terms are public for this Bossier site; it is tracked as watch context within the Amazon/STACK program and does not restate program-level facts as site facts.","tariffRefs":[],"source":null,"state":"not-in-public-record"},"curtailmentRisk":{"level":"unknown","basis":"No interruptibility, curtailment, or demand-response terms for this load appear in the reviewed public record; the risk is not assessed rather than assumed low.","source":null},"methodology":"Load bases are modeled separately and are never summed, averaged, or normalized into a single MW figure. Any basis without a named public source is recorded as not-in-public-record rather than estimated.","lastVerified":"2026-09-23","nextReviewBy":"2026-12-22"},"sqft_label":"Not disclosed","confidence":"D","acreage":"Not disclosed","first_tracked":"2025-08-14","source_published_at":"2026-02-23","last_verified":"2026-08-05","next_review_by":"2026-09-05","display_state":"current","profile_path":"/data-centers#stack-infrastructure-bossier","canonical_path":"/data-centers#stack-infrastructure-bossier","has_dedicated_profile":false,"sources":[{"publisher":"STACK Infrastructure","title":"STACK Infrastructure Announces Data Center Developments Supporting Economic Growth in Louisiana","url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","published":"2026-02-23"}]},{"record_id":"louisianai:infrastructure:vantage-east-bank","slug":"vantage-east-bank","legacy_slug":null,"canonical_slug":"vantage-east-bank","name":"Vantage East Bank","operator":"Vantage Data Centers","operator_slug":"vantage","parish":"East Baton Rouge","parish_slug":"east-baton-rouge","parish_slugs":["east-baton-rouge"],"utility":"Entergy LA","status":"Rumoured","phase":"Site search","record_kind":"watch","capex_label":"Not publicly disclosed","capex_millions":0,"capex_disclosure":"not-disclosed","included_in_statewide_capex_floor":false,"mw_label":"Not publicly disclosed","mw":null,"power_basis":null,"power_detail":{"slug":"vantage-east-bank","projectName":"Vantage East Bank","utility":"Entergy LA","requestedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"contractedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"designedMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"utilityDeliverableMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"criticalItMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"inServiceMw":{"mw":null,"label":"Not in public record","state":"not-in-public-record","source":null,"asOf":null},"agreements":[],"queuePosition":{"position":null,"state":"not-in-public-record","note":"Rumour-grade record tracked from supplier RFP signals only; no utility, queue, or service facts are in the public record.","source":null},"substationDependencies":[],"transmissionDependencies":[],"generationStorageDependencies":[],"energizationDates":[],"rateTariffPosture":{"summary":"No tariff or rate posture in the public record; the record is unconfirmed and tracked from supplier RFP signals only.","tariffRefs":[],"source":null,"state":"not-in-public-record"},"curtailmentRisk":{"level":"unknown","basis":"No interruptibility, curtailment, or demand-response terms for this load appear in the reviewed public record; the risk is not assessed rather than assumed low.","source":null},"methodology":"Load bases are modeled separately and are never summed, averaged, or normalized into a single MW figure. Any basis without a named public source is recorded as not-in-public-record rather than estimated.","lastVerified":"2026-09-23","nextReviewBy":"2026-12-22"},"sqft_label":"TBD","confidence":"D","acreage":"—","first_tracked":"2026-04-16","source_published_at":null,"last_verified":null,"next_review_by":null,"display_state":"unverified","profile_path":"/data-centers#vantage-east-bank","canonical_path":"/data-centers#vantage-east-bank","has_dedicated_profile":false,"sources":[]}]}