Boyce LA data center: is Delta Forge 1 being built?
The sourced Rapides Parish campus is Applied Digital's Delta Forge 1 near Boyce. Alexandria is the parish seat; this page does not treat the seat as the campus address. Delta Forge 1 in Rapides Parish is tracked as under construction as of May 26, 2026, per Louisiana Economic Development. Published site power is 430 MW (utility-design). Disclosed capex is $3.6B (reported). LouisianAI does not treat rumour-grade site searches as confirmed campuses. See the project page for the source trail.
Rapides Parish records that support this page.
Sources already in the tracker.
| Signal | Supports | Status | Source |
|---|---|---|---|
| Delta Forge 1 | Central Louisiana Secures $3.6 Billion Applied Digital AI Factory Campus | 2026-05-26 | Open source |
| Delta Forge 1 | Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus | 2026-01-22 | Open source |
| Delta Forge 1 | Fact Check: What early documents confirm about Applied Digital's data center coming to Rapides Parish | 2026-06-25 | Open source |
Rapides Parish data centers questions.
Is a data center being built in Rapides Parish?
Yes. LouisianAI tracks Delta Forge 1 as under construction in Rapides Parish. Status stays tied to the cited operator or LED release, not to unsourced local rumor.
Which data center projects are in Alexandria?
Alexandria is the parish seat of Rapides Parish. Tracked records for the parish: Delta Forge 1.
Who is building a data center in Rapides Parish?
Applied Digital (Delta Forge 1).
Is there a Boyce LA data center?
Yes. Applied Digital's Delta Forge 1 is the sourced campus near Boyce in Rapides Parish. Alexandria is the parish seat, not the campus address in the cited record.
Hubs, other Rapides Parish angles, and parishes with data.
Other Rapides Parish topics
Parishes with sourced data centers
Statewide jobs, news, and this parish's permits
Continue from Rapides Parish into the statewide AI hubs, or open the dedicated permit and hearing page for this parish.