§ Parishes / rapides-parish / data-centers
Rapides Parish · Data centers
Is a data center being built in Rapides Parish?
Delta Forge 1 in Rapides Parish is tracked as under construction as of May 26, 2026, per Louisiana Economic Development. Published site power is 430 MW (utility-design). Disclosed capex is $3.6B (reported). LouisianAI does not treat rumour-grade site searches as confirmed campuses. See the project page for the source trail.
1 sourced recordAlexandriaClecoUpdated 2026-09-23
Sourced campuses
Rapides Parish records that support this page.
Citations
Sources already in the tracker.
| Signal | Supports | Status | Source |
|---|---|---|---|
| Delta Forge 1 | Central Louisiana Secures $3.6 Billion Applied Digital AI Factory Campus | 2026-05-26 | Open source |
| Delta Forge 1 | Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus | 2026-01-22 | Open source |
FAQ
Rapides Parish data centers questions.
Is a data center being built in Rapides Parish?
Yes. LouisianAI tracks Delta Forge 1 as under construction in Rapides Parish. Status stays tied to the cited operator or LED release, not to unsourced local rumor.
Which data center projects are in Alexandria?
Alexandria is the parish seat of Rapides Parish. Tracked records for the parish: Delta Forge 1.
Who is building a data center in Rapides Parish?
Applied Digital (Delta Forge 1).
Related
Hubs, other Rapides Parish angles, and parishes with data.
Other Rapides Parish topics
Parishes with sourced data centers
Keep reading
Statewide jobs, news, and this parish's permits
Continue from Rapides Parish into the statewide AI hubs, or open the dedicated permit and hearing page for this parish.
- Louisiana AI jobs and training
- Louisiana AI events and convenings
- Louisiana AI companies and startups
- Louisiana AI news and weekly briefs
- Louisiana AI research and university labs
- Louisiana AI policy and LPSC filings
- Statewide Louisiana AI overview
- Louisiana AI infrastructure briefs
- Rapides Parish data center permits and hearings