What is the Louisiana AI infrastructure tracker?
The Louisiana AI infrastructure tracker is the source-linked LouisianAI dataset at /data-centers. It tracks AI data-center records by operator, parish, investment, power demand, status, timeline, and primary-source support.
Why does this count differ from other data center trackers?
Trackers count different things. Colocation directories list operating facilities by address, and building-level trackers count each building on a campus separately. This register counts a campus or a multi-campus program once, and only when a named public source documents it. Unconfirmed sites stay visible as watch rows and are left out of every total. Generation and transmission projects are tracked in the LPSC docket trail and are not added to campus power.
What is the Louisiana data center timeline?
The Louisiana data center timeline starts with Meta Hyperion under construction in Richland Parish, Amazon and STACK's multi-campus northwest Louisiana buildout after the March 2026 Bossier final plat, Hut 8 River Bend's 245 MW Phase I lease plus parish water-system work, and Applied Digital Delta Forge 1 after its January 2026 groundbreaking and mid-2027 operations target.
What is Louisiana data center power demand?
Louisiana data center source records disclose 5.76 GW of site power across 3 records. Amazon/STACK's $18.0B multi-campus program has no public MW figure, so it is not guessed; generation, transmission, storage, and renewable projects are tracked separately in the LPSC docket trail rather than added to campus power.
What is Louisiana data center capex announced?
Louisiana's core tracker denominator has a $71.6B+ source-backed disclosed-capex floor: $53.6B+ in named campus records and $18.0B in the Amazon/STACK multi-campus program, counted once. Hut 8's up-to-$10.0B Phase I ceiling is visible separately and not added to that floor. Watch rows and grid-enabling projects are intentionally excluded.
What data infrastructure exists in New Orleans, LA?
New Orleans operational-colocation coverage is separate from this source-backed AI-buildout denominator. DataCenterMap lists 23 facilities statewide as of October 12, 2026, including New Orleans-market listings; LouisianAI does not add those directory rows to the sourced AI headline until each has its own project-level source trail. The current verified AI records are in Richland, Caddo and Bossier, West Feliciana, and Rapides parishes.
What is Meta Hyperion data center status in 2026?
Meta Hyperion is under construction in Richland Parish in 2026. It is the largest tracked Louisiana AI data center, with a confirmed 5 GW build-out costing more than $50 billion, announced by Meta on July 13, 2026.
Which operators are building Louisiana AI data centers?
The Louisiana operator set is Meta in Richland Parish, Amazon Web Services with STACK in Caddo and Bossier Parishes, Hut 8 at River Bend in West Feliciana Parish, Applied Digital at Delta Forge 1 in Rapides Parish, plus operational colocation operators in Baton Rouge and New Orleans.
What is Louisiana data center water and environmental impact?
Louisiana data center water and environmental impact is project-specific: cooling design, permitted withdrawals, discharge path, parish water agreements, and LDEQ/LPSC records. Meta Hyperion has the most visible water-use record; Amazon has regional water-infrastructure commitments; Hut 8 and Applied Digital require site-level permit tracking.
Where do Louisiana secondary watch items and local policy actions live?
LouisianAI keeps unconfirmed site-control cases and parish or city policy moves off the canonical tracker until operator, permit, or utility records harden. The current dated holding surface covers Resilient Technology Park, State Line / Blanchard, the New Orleans data-center interim zoning district, and St. Charles Parish's data-center zoning code.
How many data centers are in Louisiana?
Directories count 23 (DataCenterMap) to 29 (dcmap.us, 19 operational) data center sites in Louisiana as of October 2026. LouisianAI tracks 4 source-backed AI records — named campuses and multi-campus programs: Meta Hyperion AI Data Center, Amazon Data Centers in Caddo & Bossier, Hut 8 River Bend Data Center, and Delta Forge 1. Retrieved October 12, 2026. Directory totals are not added together or to the sourced AI register because inclusion rules differ and overlap is unverified.
Where is the Louisiana data center map and list?
The statewide data-center tracker at /data-centers has the interactive map, sortable project list, parish filters, and dated statewide count. These views use the same source-backed infrastructure register.
How many AI data centers are being built in Louisiana?
LouisianAI's source-backed statewide register has 4 current AI data-center records as of November 18, 2026: 3 named campuses under construction (Meta Hyperion, Hut 8 River Bend, and Applied Digital Delta Forge 1) plus Amazon/STACK's announced multi-campus Caddo/Bossier program.
What is Meta Hyperion data center status in Louisiana in 2026?
Meta Hyperion is under construction in Richland Parish as of July 2026. It is the largest tracked Louisiana AI data center: on July 13, 2026 Meta confirmed a 5 GW build-out costing more than $50 billion, with roughly 2 GW expected by 2030 and the full campus around 2032, on about 2,250 acres with roughly 4 million square feet.
What is the largest data center in Louisiana?
Meta's Hyperion AI data center in Richland Parish is the largest by every metric: more than $50 billion of committed capital, a confirmed 5 gigawatt (5,000 MW) compute build-out, and ~4 million square feet of campus floorspace. It is also Meta's largest data center anywhere in the world and is currently under construction.
Which Louisiana parishes have the most data centers?
The core source-backed register covers Richland (Meta), Caddo and Bossier (Amazon/STACK's single multi-campus program), West Feliciana (Hut 8), and Rapides (Applied Digital). Richland accounts for at least $50 billion of the $71.6B+ disclosed-capex floor because Meta's current disclosure is a $50B-plus lower bound. Hut 8's up-to-$10 billion Phase I ceiling remains separately marked rather than added to that floor.
How much new electricity will Louisiana data centers need?
The core register has 5,760 MW of published site power across Meta, Hut 8, and Applied Digital, measured on each operator's disclosed basis rather than normalized into a utility forecast. Amazon/STACK's MW is not public. Entergy generation, transmission, storage, and renewable proposals are enabling infrastructure with their own LPSC review and are not added to the data-center MW denominator.
What incentives are Louisiana data centers receiving?
Act 730 provides a sales-and-use-tax exemption for qualifying data-center purchases. Eligibility for ITEP and any parish PILOT agreement requires a separate project-specific record. Louisiana Quality Jobs closed to new advance notifications after June 30, 2025. The incentives register links the governing instruments and distinguishes eligibility from a campus award.
When will these Louisiana data centers be operational?
Meta Hyperion is targeting initial operations in late 2027, with roughly 2 GW expected by 2030 and the full 5 GW build-out around 2032 per Meta's July 2026 announcement. Amazon/STACK's first Northwest Louisiana campus is targeting 2027–2028. Hut 8 River Bend Phase 1 is targeting 2027. Applied Digital expects initial Delta Forge 1 operations in mid-2027. Each project's specific milestone schedule is tracked on its detail page.
Which operators are building Louisiana data centers?
The current source-backed AI-buildout operators are Meta in Richland Parish, Amazon Web Services with STACK Infrastructure in Caddo and Bossier Parishes, Hut 8 in West Feliciana Parish, and Applied Digital in Rapides Parish. LouisianAI keeps the Amazon/STACK announcement as one multi-campus program until public records separate individual sites.
What is the water and environmental issue for Louisiana data centers?
The water and environmental issue is project-specific: cooling design, permitted withdrawals, discharge path, local water supply agreement, parish approvals, Louisiana Department of Conservation and Energy groundwater controls, and LDEQ water permits. Meta Hyperion has the most visible water-use record; Amazon has public regional water-infrastructure commitments; Hut 8 and Applied Digital require site-level verification as permits and cooling disclosures harden.