Power and load
not in public record- Current record
- No project-specific LPSC control record is linked in this public packet.
- Next record to watch
- Utility service agreement, interconnection filing, transmission record, or LPSC docket.
Cameron Generation, LLC identifies itself in its October 15, 2026 application as a wholly owned Venture Global LNG, Inc. subsidiary. The applicant proposes three power islands of up to 720 MW each, totaling up to 2,160 MW of generation, for nearby Cameron Campus Data Center No. 1. That separate campus is described as ten data-center buildings with its own 720 MW power island. The No. 2 facility is proposed north of Marshall Street and east of Wakefield Road and the Calcasieu Ship Channel. The environmental assessment estimates more than $1 billion in proposed project investment. The expedited-review request estimates approximately 115 permanent jobs. The application’s environmental assessment gives both 115 and 150 permanent jobs in different passages. LDEQ found the initial Title V and PSD applications administratively complete on October 19 and approved expedited processing. Final permit issuance, construction and operating status, campus IT load, tenant and actual investment remain unverified.
What matters first for Cameron Campus Data Center No. 2 application
Cameron Campus Data Center No. 2 application is tracked here by status, operator, parish, power, capex, source-backed claims, and the next public records needed before a claim should be treated as verified.
Interactive parish, utility, transmission, and water layers load as this section enters view.
Cameron Generation, LLC identifies itself in its October 15, 2026 application as a wholly owned Venture Global LNG, Inc. subsidiary. The applicant proposes three power islands of up to 720 MW each, totaling up to 2,160 MW of generation, for nearby Cameron Campus Data Center No. 1. That separate campus is described as ten data-center buildings with its own 720 MW power island. The No. 2 facility is proposed north of Marshall Street and east of Wakefield Road and the Calcasieu Ship Channel. The environmental assessment estimates more than $1 billion in proposed project investment. The expedited-review request estimates approximately 115 permanent jobs. The application’s environmental assessment gives both 115 and 150 permanent jobs in different passages. LDEQ found the initial Title V and PSD applications administratively complete on October 19 and approved expedited processing. Final permit issuance, construction and operating status, campus IT load, tenant and actual investment remain unverified.
| Claim | Value | Source |
|---|---|---|
| Capex range | Not disclosed [1][2][3]+12 | Louisiana Department of Environmental Quality |
| Power capacity | Verification needed [1][2][3]+12 | Louisiana Department of Environmental Quality |
| Site size | Verification needed · Verification needed [1][2][3]+12 | Louisiana Department of Environmental Quality |
| Jobs | Not yet verified against a public source verify | — |
| Louisiana incentive posture | Act 730 sales/use tax exemption and local PILOT structures require document-level verification. [16] | Louisiana Legislature |
| Sales/use tax and PILOT framework | Louisiana Act 730 and local PILOT structures are tracked as separate legal/economic artifacts. [16] | Louisiana Legislature |
Not disclosed in the application notice · Verified November 18, 2026
Load bases are modeled separately and are never summed, averaged, or normalized into a single MW figure. Any basis without a named public source is recorded as not-in-public-record rather than estimated. Every populated value carries its own source; every basis without one is held explicitly as not in public record.
Requested
Not in public record
Contracted
Not in public record
Design capacity
Not in public record
Utility-deliverable
Not in public record
Critical IT
Not in public record
In service
Not in public record
Agreements
Not in public record
No named service, interconnection, or offtake agreement is in the reviewed public record for this project.
Queue position
Not in public record
No public interconnection queue position.
Energization dates
Not in public record
No public energization or operations-commencement date for this project.
Substations
Not in public record
No named substation dependency is in the public record for this project.
Transmission
Not in public record
No named transmission dependency is in the public record for this project.
Generation & storage
Not in public record
No dedicated generation or storage dependency is in the public record for this project.
Rate / tariff posture
No tariff or rate posture in the public record.
Curtailment risk
Unknown
No interruptibility, curtailment, or demand-response terms for this load appear in the reviewed public record; the risk is not assessed rather than assumed low.
Verified September 23, 2026
Each row is one dated public record — or an explicit not in public record monitoring marker where no filing could be located. Rows never imply a permit exists without a linked source.
Next: Technical review, draft permits, public participation notices and final LDEQ decisions. The six records supplied under public-records request 109177 include the application, administrative completeness and expedited-processing documents. An issued final Title V or PSD permit remains unverified.
Verified November 19, 2026
Every field below carries its own source or is held explicitly as not in public record. Cooling designs, withdrawal sources, and volumes are never inferred from nearby plants, river adjacency, or typical hyperscale designs.
Cooling method
Not in public record
Monitored through LDEQ water-permit notices, Louisiana Department of Conservation and Energy groundwater records, parish water-board minutes, USACE New Orleans District, and operator disclosures.
The applicant proposes air cooling for the No. 2 generation equipment (application PDF pages 598 and 625). The separate No. 1 data-center buildings are described as using direct-to-chip closed-loop cooling (page 596). These statements describe proposed equipment at different sites.
Louisiana Department of Environmental Quality · 2026-10-15 ↗Withdrawal source
Not in public record
Monitored through LDEQ water-permit notices, Louisiana Department of Conservation and Energy groundwater records, parish water-board minutes, USACE New Orleans District, and operator disclosures.
Discharge destination
Not in public record
Monitored through LDEQ water-permit notices, Louisiana Department of Conservation and Energy groundwater records, parish water-board minutes, USACE New Orleans District, and operator disclosures.
Authorized volumes
Not in public record
No daily-gallon authorization is filed at project level. Monitored through LDEQ water-permit notices, Conservation and Energy groundwater records, and parish water-board minutes.
Water / wastewater permits
Not in public record
Monitored through LDEQ water-permit notices, Louisiana Department of Conservation and Energy groundwater records, parish water-board minutes, USACE New Orleans District, and operator disclosures.
Water-board / supply agreements
Not in public record
No parish water-board or supply agreement is in the public record. Monitored through parish water-board minutes and police-jury agendas.
Water stress
Not in public record
The applicant's Environmental Assessment Statement anticipates no adverse impact on the Chicot aquifer from the proposed demand and discusses nearby aquifer testing (application PDF page 607). An independent site-specific water-stress determination remains unverified.
Flood & hurricane
Flood zone: Zone AE, as described in the applicant's EAS
Hurricane exposure: The applicant describes the site as a FEMA Special Flood Hazard Area and proposes a surrounding floodwall for coastal flooding plus a hydrologic modification assessment during coastal permitting (application PDF page 611). The floodwall is proposed.
ReportedWetlands
The applicant anticipates effects on jurisdictional wetlands and plans a wetlands delineation and joint USACE Section 404 and Coastal Use Permit application (application PDF page 609). A completed jurisdictional delineation and issued approvals remain unverified.
PendingEmissions / air
LDEQ found the initial Title V and PSD air applications administratively complete on October 19, 2026. The reviewed application describes proposed generation equipment and modeled emissions. Permit issuance and authorized emissions remain unverified.
PendingWaste streams
The applicant anticipates industrial waste such as blowdown wastewater, maintenance debris, spent catalyst and, if onsite treatment is used, reverse-osmosis and ultrafiltration filter cake. It also anticipates hazardous maintenance wastes including spent solvents, degreasers, paint wastes and vessel-cleanout materials, with offsite recycling or disposal through licensed facilities and transporters (application PDF pages 609–610). These are planned waste-management arrangements.
ReportedReview status
Air applications administratively complete with permit decisions pending
PendingThe reviewed October 15 application includes an Environmental Assessment Statement. PDF page 607 estimates No. 2 turbine, heat-recovery steam-generator and miscellaneous water demand at approximately 0.8–1.2 million gallons per day, supplied by treated onsite wells or parish waterworks. Pages 607–610 anticipate groundwater, health, wastewater, USACE and coastal approvals, including LPDES review of reverse-osmosis and ultrafiltration residual discharge. Those statements describe future permitting work and applicant estimates. LDEQ's October 19 administrative completeness determination and expedited processing approval leave the air permit decisions pending.
Louisiana Department of Environmental Quality · 2026-10-15 ↗Verified November 18, 2026
Land deals, incentive terms, contractor awards, and community exposure each carry a named source or are held explicitly as not in the public record. Construction and operations jobs are never merged, and no dollar figure is estimated without a published record.
Land transactions
Not in the public record
No project-level land transaction is in the public record for this profile.
Assessed value
Not in the public record
The air application notice supplies no assessed value.
Incentive terms
Not in the public record
No project-specific incentive term is in the public record. Statewide program rules live on the incentives pages.
Taxable-value implications
The site’s taxable value is undisclosed.
Method: An air application does not establish a tax assessment or an incentive award.
Construction packages
Not in the public record
No project-level construction package is in the public record for this profile.
Contractor awards
Not in the public record
No contractor award is in the public record for this project; awards are monitored through parish bid postings and operator announcements.
Construction jobs
Not in the public record
No site-specific construction jobs figure is disclosed.
Operations jobs
Not in the public record
No site-specific operating jobs figure is disclosed.
Workforce availability
Not in the public record
No site-specific workforce agreement is disclosed.
Lodging & housing pressure
Not in the public record
No site-specific housing impact is disclosed.
Roads & public services
Not in the public record
No road or public-service impact is in the public record for this profile.
Local tax-base exposure
Not in the public record
No site-specific tax estimate is disclosed.
Edit the inputs to compare an ad-valorem proxy against a PILOT discount, construction labor hours, and peak power demand relative to an editable parish consumption baseline.
Ad-valorem proxy
$0
PILOT proxy
$0
Construction job hours
0
Demand vs parish use
0x
Cameron Campus Data Center No. 2 application is tracked at Verification needed and Verification needed, with Verification needed of power capacity where public sources support the number.
Current tracked figures show Verification needed permanent jobs and Verification needed construction jobs, subject to source verification.
A PILOT is a payment-in-lieu-of-taxes structure negotiated locally; this page tracks the public artifacts needed to compare ad-valorem exposure with negotiated payments.
Application filed. Exact phase delivery dates remain tied to operator updates, utility milestones, parish permits, and regulatory filings.
Cameron Campus Data Center No. 2 application is tracked in Cameron Parish, Louisiana.
Cameron Generation, LLC is the operator listed for Cameron Campus Data Center No. 2 application.
Water use is tracked as a verification item because definitive cooling and withdrawal figures usually appear in permits, utility exhibits, or operator environmental disclosures.
Louisiana data-center incentives can include Act 730 sales/use tax treatment and local PILOT structures; the exact package should be verified against state, parish, and operator documents.
The page tracks substations, transmission watch corridors, and utility filings as source-backed signals rather than engineering-grade interconnection maps.
Confidence labels distinguish seed, reported, and verified claims so readers can separate early intelligence from document-backed facts.
Cite this page or subscribe to filings that mention Cameron Campus Data Center No. 2 application.
LouisianAI methodology and reuse guardrails; not an independent project fact source.
Primary state-law lookup surface for Act 730 sales/use tax exemption and local PILOT diligence.