Project Intelligence
The Louisiana AI infrastructure tracker for source-linked project status, parish, operator, power demand, timeline, and verification signals.
Decision lens
Evidence coverage in the current view
Filter by research posture without changing the published record. Linked source rows measure catalog coverage; project pages remain the record-level source trail.
- Visible records
- 6
- Verified
- 0
- Records with sources
- 5/6
- Linked source rows
- 8
6 records in the active research lens
| Operator | Parish | Status | Key intelligence | |||
|---|---|---|---|---|---|---|
| Amazon Data Centers in Caddo & Bossier | Amazon / STACK | Caddo & Bossier | Announced | $12B | 2 linked · Reported | Track how the linked Caddo, Blanchard, and Bossier sites separate into their own permitting records. Water-service agreements, cooling-water discharge, wetlands buffers, substations, and general-contractor packages are t… |
| Delta Forge 1 | Applied Digital | Rapides | Under construction | $3.6B | 2 linked · Reported | Watch Cleco delivery work, any project-specific LPSC proceedings, and the unresolved site-size scopes: Applied Digital has described more than 500 and more than 600 acres, while Louisiana's rollout describes approximatel… |
| Hut 8 River Bend Data Center | Hut 8 | West Feliciana | Under construction | $10B | 2 linked · Reported | Key watch items are Entergy service milestones, Hut 8's $16M parish water-system expansion, closed-loop cooling claims, and how much of the 1 GW potential becomes commercialized beyond the 245 MW initial lease. |
| Meta Hyperion AI Data Center | Meta Platforms | Richland | Under construction | $50B | 1 linked · Reported | Watch U-37425 and U-37882, Entergy substation and transmission work, groundwater reporting, and the ratepayer-cost debate around the larger Hyperion buildout. Labor, civil, and support-service demand remains one of north… |
| STACK Bossier site context | STACK Infrastructure | Bossier | Watch | — | 1 linked · Seed | |
| Vantage East Bank | Vantage Data Centers | East Baton Rouge | Rumoured | — | 0 linked · Seed |
Verification posture
The evidence lens is a view over the current catalog. Confidence class and linked-source count make research posture explicit, while the full CSV/JSON exports preserve the complete machine-readable set.
Sources: LED filings • parish permits and dockets • utility interconnection filings • official operator updates. Pair this view withProject Intelligence cards,methodology briefs, andthe vendor ecosystem.