Skip to main content
LIVEResearch desk operatingU-37425Entergy LA filing · 7.2 GW load additionRICHLANDHyperion phase 3 permit acceptedCADDOSTACK substation civil mobilisingW. FELICIANAHut 8 River Bend hearing 06/03
Primary source

Project Intelligence

The Louisiana AI infrastructure tracker for source-linked project status, parish, operator, power demand, timeline, and verification signals.

Decision lens

Evidence coverage in the current view

Filter by research posture without changing the published record. Linked source rows measure catalog coverage; project pages remain the record-level source trail.

Visible records
6
Verified
1
Records with sources
6/6
Linked source rows
40

6 records in the active research lens

OperatorParishStatusKey intelligence
Amazon AI Data Center CampusesAmazon (with STACK Infrastructure)Caddo & Bossier ParishesAnnounced & preparing for groundbreak$12B5 linked · Reported Three interconnected campuses reshape regional power, water, and infrastructure. Opportunities arise across general contractors, electrical, cooling, fiber, and local suppliers as procurement windows open.
Delta Forge 1Applied DigitalRapides Parish (near Boyce)Under construction$3.6B11 linked · VerifiedTrack Cleco infrastructure delivery, any project-specific LPSC proceedings, construction delivery, the mid-2027 operations target, and source-specific acreage scopes without collapsing utility power into critical IT load…
Emerging Central/North Louisiana AI InfrastructureMultiple (LED pipeline)Various (statewide monitoring)Early pipeline / to be verified6 linked · Seed Statewide momentum expands demand for construction, power infrastructure, cybersecurity, cooling tech, and AI-adjacent services even before operators disclose parcel-level detail.
Hut 8 River Bend AI Data Center CampusHut 8West Feliciana ParishAnnounced6 linked · Reported River-adjacent logistics can compress cooling capital cycles while elevating scrutiny on intake/discharge narratives and redundant fiber paths into southeast Louisiana hubs.
Hyundai Steel Louisiana Mill (Advanced Partnerships)Hyundai Steel / Hyundai Motor Group ecosystemAscension ParishMajor industrial investment6 linked · Seed Watch Italian/German equipment partner releases, parish incentive milestones, and downstream logistics expansions that correlate with AI-heavy factory telemetry procurement.
Meta Hyperion AI Data CenterMetaRichland ParishUnder construction6 linked · Seed Massive power demand driving Entergy to build multiple natural gas plants. Track supplier RFPs, construction contracts, workforce training programs, cooling/water solutions, and secondary real estate/logistics opportuni…

Verification posture

The evidence lens is a view over the current catalog. Confidence class and linked-source count make research posture explicit, while the full CSV/JSON exports preserve the complete machine-readable set.

Sources: LED filings • parish permits and dockets • utility interconnection filings • official operator updates. Pair this view withProject Intelligence cards,methodology briefs, andthe vendor ecosystem.

VERIFIED PRIMARY SOURCES • INDEPENDENT • RELEASE CYCLE STAMP