LIVEResearch desk operatingU-37425Entergy LA filing · 7.2 GW load additionRICHLANDHyperion phase 3 permit acceptedCADDOSTACK substation civil mobilisingW. FELICIANAHut 8 River Bend hearing 06/03
Primary source

Project Intelligence

The Louisiana AI infrastructure tracker for source-linked project status, parish, operator, power demand, timeline, and verification signals.

OperatorParishStatusSourcesKey Intelligence
Amazon AI Data Center CampusesAmazon (with STACK Infrastructure)Caddo & Bossier ParishesAnnounced & preparing for groundbreak$12B5 linked · reported Three interconnected campuses reshape regional power, water, and infrastructure. Opportunities arise across general contractors, electrical, cooling, fiber, and local suppliers as procurement windows open.
Applied Digital Project LightningApplied DigitalRapides Parish (near Boyce)Site acquired $26.9M6 linked · reported Central Louisiana geography makes the node a contender for additional hyperscale tenants; monitor equipment procurement, laydown logistics, and workforce partnerships for phase-one signals.
Emerging Central/North Louisiana AI InfrastructureMultiple (LED pipeline)Various (statewide monitoring)Early pipeline / to be verified6 linked · seed Statewide momentum expands demand for construction, power infrastructure, cybersecurity, cooling tech, and AI-adjacent services even before operators disclose parcel-level detail.
Hut 8 River Bend AI Data Center CampusHut 8West Feliciana ParishAnnounced 6 linked · reported River-adjacent logistics can compress cooling capital cycles while elevating scrutiny on intake/discharge narratives and redundant fiber paths into southeast Louisiana hubs.
Hyundai Steel Louisiana Mill (Advanced Partnerships)Hyundai Steel / Hyundai Motor Group ecosystemAscension ParishMajor industrial investment 6 linked · seed Watch Italian/German equipment partner releases, parish incentive milestones, and downstream logistics expansions that correlate with AI-heavy factory telemetry procurement.
Meta Hyperion AI Data CenterMetaRichland ParishUnder construction 6 linked · seed Massive power demand driving Entergy to build multiple natural gas plants. Track supplier RFPs, construction contracts, workforce training programs, cooling/water solutions, and secondary real estate/logistics opportuni…

Verification posture

Projects hydrate from Supabase with explicit source rows + Archive.org snapshot hooks. Download machine-readable exports via the CSV/JSON buttons above (same filters as `/api/projects`).

Sources: LED filings • parish permits and dockets • utility interconnection filings • official operator updates. Pair this view with Project Intelligence cards, methodology briefs, and the vendor ecosystem.

VERIFIED PRIMARY SOURCES • INDEPENDENT • RELEASE CYCLE STAMP