Applied Digital Project Lightning.

672-acre site acquired for $26.9M near Boyce with AI/HPC positioning; local authorities advanced industrial zoning/PILOT mechanics while civil packages mobilized along I-49. Scope narratives span early-phase infrastructure spend through multi-billion-dollar headlines tied to financing packages.

What matters first for Applied Digital Project Lightning

Applied Digital's Louisiana campus is Delta Forge 1, also tracked on LouisianAI under Project Lightning. Public company and Louisiana Economic Development materials describe 430 MW of total utility power, up to 300 MW of critical IT load, 200 direct on-site jobs, and 1,000 peak construction jobs, with first operations targeted for mid-2027. Follow this profile for the current status, utility posture, water or permit controls, source links, and alias terms that engines and readers use for the same campus.

Project map layers
672 acres · 672 ac · last sync
Operator
Applied Digital
Parish
Rapides Parish
Utility
Cleco
Peak MW
Verification needed
Capex
$26.9M-$7B
Sq ft
Verification needed
Acres
672 acres
Confidence
C
Entity bridge

Delta Forge 1 and Project Lightning are the same Applied Digital campus in Rapides Parish; the public timeline answer is January 2026 groundbreaking and a mid-2027 initial-operations target.

What is Delta Forge 1 in Louisiana? Applied Digital's Louisiana campus is Delta Forge 1, also tracked on LouisianAI under Project Lightning. Public company and Louisiana Economic Development materials describe 430 MW of total utility power, up to 300 MW of critical IT load, 200 direct on-site jobs, and 1,000 peak construction jobs, with first operations targeted for mid-2027. The canonical local profile is this page: /data-centers/applied-digital-project-lightning.

The important search bridge is naming: Delta Forge 1 is Applied Digital's company-announced name, while Project Lightning is the Louisiana watch-queue alias. The power answer should route to this profile, the Applied Digital operator hub, Rapides Parish, Cleco service, Act 730 posture, and the difference between the company's 500-plus-acre campus framing and the state's 300-acre initial-buildout framing.

Alias cluster · canonicalized here
Applied Digital Project Lightning
Applied Digital Delta Forge 1
Delta Forge 1
Applied Digital Boyce data center
Applied Digital Rapides Parish AI factory
Applied Digital Louisiana AI factory
Project Lightning AI factory campus
Same tracked project cluster: Applied Digital Project Lightning, Delta Forge 1, Applied Digital Delta Forge 1, Applied Digital Boyce data center, Applied Digital Rapides Parish AI factory, Applied Digital Louisiana AI factory, and Project Lightning AI factory campus all point to the same Applied Digital campus near Boyce in Rapides Parish.

What is Delta Forge 1 in Louisiana?

Delta Forge 1 is Applied Digital's company-announced name for the Louisiana AI factory campus that LouisianAI also tracks under the Project Lightning alias. It is the Applied Digital campus near Boyce in Rapides Parish.

What is Applied Digital Project Lightning Louisiana?

Applied Digital Project Lightning Louisiana is LouisianAI's canonical project profile for Applied Digital's Rapides Parish AI factory campus. The company calls the first phase Delta Forge 1; LouisianAI keeps Project Lightning as the Louisiana tracking alias so both searches resolve to the same source-backed page.

How much power will Delta Forge 1 use?

Applied Digital says Delta Forge 1 is designed for 430 MW of total utility power, enabling up to 300 MW of critical IT load in its initial two-building phase. Cleco is the named utility counterpart in Louisiana's public rollout materials.

Where is Applied Digital's Louisiana AI factory?

Applied Digital's Louisiana AI factory is in Rapides Parish near Boyce. LouisianAI routes Boyce data center, Delta Forge 1, Applied Digital Rapides Parish AI factory, and Project Lightning searches to this canonical project profile and the Rapides Parish hub.

When is Applied Digital targeting operations in Louisiana?

Applied Digital and Louisiana Economic Development both say initial Delta Forge 1 operations are targeted for mid-2027, subject to construction execution, utility delivery, and final site buildout.

Desk thesis

The campus IS the load.

672-acre site acquired for $26.9M near Boyce with AI/HPC positioning; local authorities advanced industrial zoning/PILOT mechanics while civil packages mobilized along I-49. Scope narratives span early-phase infrastructure spend through multi-billion-dollar headlines tied to financing packages.

Source-linked claim table
ClaimValueSource
Capex range$26,900,000 to $7,000,000,000 [1][2][3][4][5][6]Rapides Parish Journal
Power capacityVerification needed [1][2][3][4][5][6]Rapides Parish Journal
Site size672. acres [1][2][3][4][5][6]Rapides Parish Journal
Jobs200 permanent · 1500 construction [1][2][3][4][5][6]Rapides Parish Journal
Water/cooling sourceClosed-loop cooling cited in local reporting [1][2][3][4][5][6]Rapides Parish Journal
Sales/use tax and PILOT frameworkLouisiana Act 730 and local PILOT structures are tracked as separate legal/economic artifacts. [7]Louisiana Legislature
Entity aliasesApplied Digital Project Lightning, Delta Forge 1, Applied Digital Delta Forge 1, Applied Digital Boyce data center, Applied Digital Rapides Parish AI factory, Applied Digital Louisiana AI factory, and Project Lightning AI factory campus all point to the same Applied Digital campus near Boyce in Rapides Parish. [3][1][2][4][6][5]Applied Digital / SEC EDGAR
Timeline

Public record.

  1. Dec 1, 2025
    Project publicly announced or entered the source-backed watch queue.
  2. Mar 1, 2026
    Groundbreaking or civil mobilization milestone recorded.
Economic impact calculator

Stress-test the assumptions.

Edit the inputs to compare an ad-valorem proxy against a PILOT discount, construction labor hours, and peak power demand relative to an editable parish consumption baseline.

Ad-valorem proxy

$386,479,500

PILOT proxy

$212,563,725

Construction job hours

6,240,000

Demand vs parish use

0x

What to watch next

The next filings, in plain sight.

  • LPSC docket activity for generation, transmission, and rate-base recovery tied to data-center load.
  • Rapides Parish permit, council, police jury, and economic-development agendas.
  • Operator press rooms, SEC filings, and investor presentations for delivery dates, lease economics, and tenant commitments.
  • Utility substation, transformer, and transmission-procurement signals near the site.
  • Workforce board, contractor, and supplier notices that usually precede peak construction demand.
Power and ratepayer questions roll up through the LPSC data center docket tracker, which normalizes the active filings and source links.
FAQ

Recurring questions, answered.

What is Delta Forge 1 in Louisiana?

Delta Forge 1 is Applied Digital's company-announced name for the Louisiana AI factory campus that LouisianAI also tracks under the Project Lightning alias. It is the Applied Digital campus near Boyce in Rapides Parish.

What is Applied Digital Project Lightning Louisiana?

Applied Digital Project Lightning Louisiana is LouisianAI's canonical project profile for Applied Digital's Rapides Parish AI factory campus. The company calls the first phase Delta Forge 1; LouisianAI keeps Project Lightning as the Louisiana tracking alias so both searches resolve to the same source-backed page.

How much power will Delta Forge 1 use?

Applied Digital says Delta Forge 1 is designed for 430 MW of total utility power, enabling up to 300 MW of critical IT load in its initial two-building phase. Cleco is the named utility counterpart in Louisiana's public rollout materials.

Where is Applied Digital's Louisiana AI factory?

Applied Digital's Louisiana AI factory is in Rapides Parish near Boyce. LouisianAI routes Boyce data center, Delta Forge 1, Applied Digital Rapides Parish AI factory, and Project Lightning searches to this canonical project profile and the Rapides Parish hub.

When is Applied Digital targeting operations in Louisiana?

Applied Digital and Louisiana Economic Development both say initial Delta Forge 1 operations are targeted for mid-2027, subject to construction execution, utility delivery, and final site buildout.

How big is Applied Digital Project Lightning?

Applied Digital Project Lightning is tracked at Verification needed and 672 acres, with Verification needed of power capacity where public sources support the number.

How many jobs will Applied Digital Project Lightning create?

Current tracked figures show 200 permanent jobs and 1,500 construction jobs, subject to source verification.

What is the PILOT agreement for Applied Digital Project Lightning?

A PILOT is a payment-in-lieu-of-taxes structure negotiated locally; this page tracks the public artifacts needed to compare ad-valorem exposure with negotiated payments.

When will Applied Digital Project Lightning come online?

Site acquired — early development. Exact phase delivery dates remain tied to operator updates, utility milestones, parish permits, and regulatory filings.

Which parish is Applied Digital Project Lightning in?

Applied Digital Project Lightning is tracked in Rapides Parish, Louisiana.

Who is the operator of Applied Digital Project Lightning?

Applied Digital is the operator listed for Applied Digital Project Lightning.

How much water will Applied Digital Project Lightning use?

Water use is tracked as a verification item because definitive cooling and withdrawal figures usually appear in permits, utility exhibits, or operator environmental disclosures.

What incentives did Louisiana give Applied Digital?

Louisiana data-center incentives can include Act 730 sales/use tax treatment and local PILOT structures; the exact package should be verified against state, parish, and operator documents.

What power infrastructure serves Applied Digital Project Lightning?

The page tracks substations, transmission watch corridors, and utility filings as source-backed signals rather than engineering-grade interconnection maps.

Why does LouisianAI label confidence levels?

Confidence labels distinguish seed, reported, and verified claims so readers can separate early intelligence from document-backed facts.

Subscribe

Project-specific milestone alerts.

Cite this page or subscribe to filings that mention Applied Digital Project Lightning.

Primary sources · 7 cited

The public record, linked.

[1]
Construction reporting at Boyce data center site

Local verification of civil mobilization / staging posture.

Rapides Parish Journal · 2026-03-25
Open →
[2]
England Authority advance on PILOT + Applied Digital project

Local governance artifact covering PILOT advancement.

Rapides Parish Journal · 2026-04-24
Open →
[3]
Applied Digital Form 8-K (Louisiana land acquisition disclosure)

Primary securities disclosure anchoring land acquisition financing.

Applied Digital / SEC EDGAR · 2025-12-18
Open →
[4]
Alexandria broadcast reporting on Boyce industrial rezoning

Regional reporting tying parish rezoning actions to Boyce site.

KALB · 2026-03-02
Open →
[5]
Rapides Parish Clerk of Court (official portal)

Primary parish civil records portal for instrument retrieval.

Rapides Parish Clerk of Court
Open →
[6]
England Authority negotiation reporting

Early-phase reporting naming Applied Digital pursuit.

Rapides Parish Journal · 2026-01-22
Open →
[7]
Louisiana Legislature bill and Act search for Act 730 data-center exemptions

Primary state-law lookup surface for Act 730 sales/use tax exemption and local PILOT diligence.

Louisiana Legislature
Open →