Source-linked diligence packet

Hut 8 River Bend Campus

A reusable record of the current tracker claim, its source path, its uncertainty boundary, and the next public event that could change the conclusion.

C confidenceUnder constructionWest Feliciana Parish
Packet generated
Jul 23, 2026
Canonical packet URL
https://louisianai.com/diligence/hut-8-river-bend-ai-data-center-campus
Critical claim table

What this packet supports—and what it does not.

Methodology and counting rules
ClaimCurrent valueEvidence stateSource pathBoundary
Project and operatorHut 8 River Bend Campus · Hut 8reportedNo attached source recordNo source record is attached to this packet; treat the tracker row as a watch item, not independently verified diligence.
Parish and utilityWest Feliciana Parish · Entergy LAreportedNo attached source recordUtility territory is context, not proof of an executed service agreement or energization date.
Current tracker statusUnder construction · Phase I buildoutreportedNo attached source recordStatus is a source-labelled tracking assessment. Open regulatory records are not approvals.
Tracked capital investment$10BreportedNo attached source recordInvestment is a tracked public figure, not a completed-spend assertion.
Tracked power capacity330 MWreportedNo attached source recordCapacity, contracted load, utility design, critical IT load, and in-service power are distinct concepts.
Catalyst map

A project status is not a complete diligence answer.

Power and load

not in public record
Current control
No project-specific LPSC control record is linked in this public packet.
Next record to watch
Utility service agreement, interconnection filing, transmission record, or LPSC docket.
Open control context

Permits and site controls

watch
Current control
No controlling parish permit or site-plan record is linked in this packet.
Next record to watch
Parish agenda, site-plan approval, zoning packet, or environmental permit notice.
Open control context

Water and cooling

watch
Current control
No project-specific withdrawal, cooling, or water-service record is linked in this packet.
Next record to watch
LDEQ notice, groundwater/water-board record, utility agreement, or operator environmental disclosure.
Open control context

Construction and delivery

open record
Current control
Under construction · Phase I buildout
Next record to watch
Operator construction milestone, utility energization evidence, parish inspection, or filed completion notice.
Open control context
Verified changes

Human-reviewed revisions only.

No human-reviewed revisions are published for this record yet. The absence of a revision does not establish that the project is unchanged; it means there is no approved change-register entry to report.

Reuse safely

This packet is a routing and research artifact, not legal, tax, engineering, financing, or investment advice. Verify every material claim against the linked primary or source-of-record page before reuse.