Evidence claim

Evidence graph / Project / mw

Meta Hyperion AI Data Center

Hyperion is tracked at 5,000 MW on a compute-capacity basis; the LPSC expansion docket separately describes 5,200+ MW of new generation on a utility-design basis.

2 evidence nodes · claim meta-hyperion-ai-data-center.mw

Conflicting evidence

These sources disagree — or measure on different bases. Both stay on the record; the desk does not collapse distinct bases into a common figure.

conflictingconfidence A2026-07-13 · observed 2026-09-23

Meta announces 5 GW (5,000 MW) for Hyperion on a compute-capacity basis.

Desk record: mwLabel "5,000", powerBasis "compute-capacity".
Fields changedmwmwLabelpowerBasis

Conflicts with: Louisiana Public Service CommissionU-37882 primary filing — Entergy Louisiana certification of generation and transmission resources and other relief for Meta expansion

conflictingconfidence A2026-03-27 · observed 2026-09-23

The U-37882 expansion filing describes more than 5,200 MW of new generation on a utility-design basis — a different MW basis than Meta's campus compute figure, not the same number.

"Entergy describes the package as seven additional gas combined-cycle plants totaling more than 5,200 MW, roughly 240 miles of 500 kV transmission, storage, nuclear uprates, and up to 2,500 MW of Meta-funded renewables."
Fields changedpowerBasis

Conflicts with: MetaTeachers and Local Businesses Win as Meta Expands Louisiana Data Center