Delta Forge 1

Delta Forge 1 is tracked at 430 MW on a utility-design basis, with up to 300 MW of critical IT load reported by the operator.

1 evidence node · claim applied-digital-project-lightning.mw

Supporting evidence

supportingconfidence A2026-01-22 · observed 2026-09-23

Applied Digital reports 430 MW of total utility design, with up to 300 MW of critical IT load — two distinct bases from one source.

"Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus" (January 22, 2026); desk operator record: "430 MW of total utility design, up to 300 MW of critical IT load".
Fields changedmwmwLabelpowerBasis