Operator · Power

What utility powers AI data centers in Applied Digital in Louisiana and what's the load picture?

Electric service in Applied Digital in Louisiana is provided primarily by the incumbent utility (Entergy Louisiana, SWEPCO, Cleco, or a regional cooperative depending on territory). AI data center loads in Louisiana are typically interconnected at transmission voltage (138 kV or 230 kV) and require new substation buildouts. Applied Digital's 1 tracked Louisiana project: Applied Digital Project Lightning.

Applied Digital at a glance
Parent
Applied Digital Corporation
Louisiana projects tracked
1

Frequently asked

What utility powers AI data centers in Applied Digital in Louisiana and what's the load picture?

Electric service in Applied Digital in Louisiana is provided primarily by the incumbent utility (Entergy Louisiana, SWEPCO, Cleco, or a regional cooperative depending on territory). AI data center loads in Louisiana are typically interconnected at transmission voltage (138 kV or 230 kV) and require new substation buildouts. Applied Digital's 1 tracked Louisiana project: Applied Digital Project Lightning.

Who is the ultimate parent of Applied Digital?

Applied Digital is part of Applied Digital Corporation. See the operator hub at louisianai.com/operators/applied-digital for the full corporate context, Louisiana project list, and source-cited filings.

Which Louisiana parishes does Applied Digital operate in?

Applied Digital has tracked footprint in: Rapides Parish (near Boyce).

Other Applied Digital Louisiana angles