Operator · Power
What utility powers AI data centers in Hut 8 Corp in Louisiana and what's the load picture?
Electric service in Hut 8 Corp in Louisiana is provided primarily by the incumbent utility (Entergy Louisiana, SWEPCO, Cleco, or a regional cooperative depending on territory). AI data center loads in Louisiana are typically interconnected at transmission voltage (138 kV or 230 kV) and require new substation buildouts. Hut 8 Corp's 1 tracked Louisiana project: Hut 8 River Bend AI Data Center Campus.
- Parent
- Hut 8 Corp
- Louisiana projects tracked
- 1
Frequently asked
What utility powers AI data centers in Hut 8 Corp in Louisiana and what's the load picture?
Electric service in Hut 8 Corp in Louisiana is provided primarily by the incumbent utility (Entergy Louisiana, SWEPCO, Cleco, or a regional cooperative depending on territory). AI data center loads in Louisiana are typically interconnected at transmission voltage (138 kV or 230 kV) and require new substation buildouts. Hut 8 Corp's 1 tracked Louisiana project: Hut 8 River Bend AI Data Center Campus.
Who is the ultimate parent of Hut 8 Corp?
Hut 8 Corp is part of Hut 8 Corp. See the operator hub at louisianai.com/operators/hut-8 for the full corporate context, Louisiana project list, and source-cited filings.
Which Louisiana parishes does Hut 8 Corp operate in?
Hut 8 Corp has tracked footprint in: West Feliciana Parish.