{"version":"2026.06.25","operator":{"slug":"hut-8","name":"Hut 8 Corp.","ticker":"NASDAQ:HUT","hq":"Toronto, ON","tracked_since":"22 May 2025","active":true,"campus_count":1,"firm_load":"1,500 MW","capex":"$10B","jobs":"800 jobs","first_commissioning":"Q1 2028","summary":"611-acre Mississippi-adjacent site north of St. Francisville. Permitting and EPC in motion.","counterparties":[{"name":"Entergy Louisiana","role":"Power · proposed"},{"name":"West Feliciana Parish","role":"Permitting"},{"name":"LDEQ","role":"Air + water"}],"stance":[{"label":"Power posture","value":"Pending · interconnection study"},{"label":"Water posture","value":"River-adjacent · low risk"},{"label":"Labor posture","value":"Scouting"},{"label":"Permit risk","value":"Moderate · hearing 06/03"}],"coverage_12mo":[0,0,0,1,1,2,1,3,2,3,4,3]},"sites":[{"slug":"hut-8-river-bend-ai-data-center-campus","name":"Hut 8 River Bend Campus","parish":"West Feliciana","parish_slug":"west-feliciana","acreage":"627 ac","mw":330,"mw_label":"330","status":"Under construction","confidence":"C","profile_path":"/data-centers/hut-8-river-bend-ai-data-center-campus","has_dedicated_profile":true}]}