{"version":"2026.06.25","operator":{"slug":"amazon","name":"Amazon Web Services","ticker":"NASDAQ:AMZN","hq":"Seattle, WA","tracked_since":"04 Feb 2025","active":true,"campus_count":3,"firm_load":"3,000 MW","capex":"$12B","jobs":"2,200 jobs","first_commissioning":"Q4 2027","summary":"Operating a three-campus hyperscale cluster across Caddo and Bossier in partnership with STACK Infrastructure.","counterparties":[{"name":"SWEPCO","role":"Power · staged interconnect"},{"name":"LED","role":"Megaproject framework"},{"name":"Caddo Parish","role":"Site permits"},{"name":"Bossier Parish","role":"Site permits"},{"name":"STACK Infrastructure","role":"Develop + operate"}],"stance":[{"label":"Power posture","value":"Staged · 950 MW first"},{"label":"Water posture","value":"Red River withdrawal · pending"},{"label":"Labor posture","value":"Pre-mobilising"},{"label":"Permit risk","value":"Moderate"}],"coverage_12mo":[0,0,1,2,1,3,4,3,4,4,5,6]},"sites":[{"slug":"amazon-ai-data-center-campuses","name":"Amazon NW Louisiana Cluster","parish":"Caddo & Bossier","parish_slug":"caddo","acreage":"1,400 ac","mw":3000,"mw_label":"~3,000","status":"Announced","confidence":"B","profile_path":"/data-centers/amazon-ai-data-center-campuses","has_dedicated_profile":true}]}