{"version":"2026-07-22","generatedAt":"2026-07-24T00:01:23.818Z","canonicalLensUrl":"https://louisianai.com/data-centers","filters":{"status":"all","operator":"all","parish":"all","utility":"all","confidence":"all","capex":"all","mw":"all","sort":"capex-desc","density":"comfortable"},"scope":{"totalRecords":6,"confirmedRecords":5,"watchListRecords":1,"knownCapexMillions":80100,"knownMw":9510,"confidence":{"A":0,"B":3,"C":2,"D":1}},"inclusionRule":"Confirmed records are included in aggregate scope. Watch-list rows are identified separately and must not be used in campus, capex, MW, parish, or operator aggregate claims.","reproducibility":["This manifest preserves the validated filter and sort state from the tracker URL.","The generation timestamp identifies when the static public-record catalog was rendered.","Every material numeric, regulatory, legal, tax, water, permit, ownership, or timeline claim still requires verification against the linked project or primary source record."],"records":[{"slug":"meta-hyperion-ai-data-center","name":"Meta Hyperion AI Data Center","operator":"Meta Platforms","parish":"Richland","utility":"Entergy LA","status":"Under construction","capexLabel":"$50B+","mwLabel":"5,000","confidence":"B","canonicalProjectUrl":"https://louisianai.com/data-centers/meta-hyperion","inclusion":"confirmed"},{"slug":"amazon-ai-data-center-campuses","name":"Amazon NW Louisiana Cluster","operator":"Amazon / STACK","parish":"Caddo & Bossier","utility":"SWEPCO","status":"Announced","capexLabel":"$12B","mwLabel":"~3,000","confidence":"B","canonicalProjectUrl":"https://louisianai.com/data-centers/amazon-ai-data-center-campuses","inclusion":"confirmed"},{"slug":"hut-8-river-bend-ai-data-center-campus","name":"Hut 8 River Bend Campus","operator":"Hut 8","parish":"West Feliciana","utility":"Entergy LA","status":"Under construction","capexLabel":"$10B","mwLabel":"330","confidence":"C","canonicalProjectUrl":"https://louisianai.com/data-centers/hut-8-river-bend-ai-data-center-campus","inclusion":"confirmed"},{"slug":"stack-infrastructure-bossier","name":"STACK Infrastructure Bossier","operator":"STACK Infrastructure","parish":"Bossier","utility":"SWEPCO","status":"Civil works","capexLabel":"$4.5B","mwLabel":"750","confidence":"B","canonicalProjectUrl":"https://louisianai.com/data-centers/stack-infrastructure-bossier","inclusion":"confirmed"},{"slug":"applied-digital-project-lightning","name":"Delta Forge 1","operator":"Applied Digital","parish":"Rapides","utility":"Cleco","status":"Under construction","capexLabel":"$3.6B","mwLabel":"430","confidence":"C","canonicalProjectUrl":"https://louisianai.com/data-centers/applied-digital-project-lightning","inclusion":"confirmed"},{"slug":"vantage-east-bank","name":"Vantage East Bank","operator":"Vantage Data Centers","parish":"East Baton Rouge","utility":"Entergy LA","status":"Rumoured","capexLabel":"$800M","mwLabel":"100","confidence":"D","canonicalProjectUrl":"https://louisianai.com/data-centers/vantage-east-bank","inclusion":"watch-list"}]}